CityOH
Posted
-
Nov 18, 2026
Central College Subtrunk, Phase 3
Provide a wastewater infrastructure involving construction of approximately 10,926 LF of 48-inch sanitary sewer reinforced concrete jacking pipe is provided with an internal cast-in-place hdpe stud liner for corrosion protection. The project also includes approximately 63 LF of 18- inch, 82 LF of 8-inch, and 70 LF of 12-inch sanitary sewer installed by open cut and installation of twelve (12) manholes. Construction also includes four (4) jacking pits, five (5) receiving pits, and eight (8) microtunnel drives. The project will include bypass pumping and abandonment of the existing 24-inch sugar run subtrunk, dewatering.