CityOR
Jul 27, 2026
Closes
Aug 19, 2026
Washington Street Sidewalk
Install sidewalk on Washington Street between Highway 30 and Third Avenue. The project includes cutting and removing asphalt and concrete sidewalk, and installing approx. 260 LF ADA compliant concrete sidewalk, ADA compliant curb ramps at Highway 30 and Second Street intersection with Washington Street, concrete driveway approach, 42 LF gabion retaining wall (max height 4'), and stormwater planter swales.