Shippingport Borough - Rear Access Ramp Improvements - Contract A - Brick Ledge Removal and Replacement (Re-Bid) RFP

Description: 1. Select Demolition: All select demolition work shown on Drawing Sheets G0.00, D2.00 and A1.00 are included within this item. This item generally consists of, but is not limited to, removal of existing brick veneer; removal of existing concrete block brick ledge down to existing foundations; removal of existing rim joist and sill plate; removal of existing downspout; removal of existing handrail and brackets; removal of existing 2x lumber and anchors; removal of existing concrete; removal of existing steel angle and anchors; removal of existing concrete block and foundations below grade; and removal of all debris remaining from previous ramp demolition. 2. New Work: Construction of new brick veneer with corrugated wall ties at 1’-4” O/C; new brick soldier course to match existing brick and grout in size and color; new 4” concrete block brick ledge with corrugated wall ties at 1’-4” O/C; new concrete at existing door/threshold; new aluminum downspout including connection to existing stormwater management system; repair/rebuild of existing brick rowlock to match existing; replacement of sill plate and rim joists; and installation of compacted porous fill such as AASHTO No. 57 aggregate to grade within the limits of the existing ramp. Contractor shall provide proper shoring and protection of existing building materials to remain to prevent damage to existing materials. Complete improvements in proper sequencing as required to protect existing building materials to remain. No additional payment will be made for removal and replacement of materials beyond the limits shown on the Contract Drawings.

Buyer
Released
-
Closes
Dec 9, 2026(17 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts