1. Select Demolition: All select demolition work shown on Drawing Sheets G0.00, D2.00 and A1.00 are included within this item. This item generally consists of, but is not limited to, removal of existing brick veneer; removal of existing concrete block brick ledge down to existing foundations; removal of existing rim joist and sill plate; removal of existing downspout; removal of existing handrail and brackets; removal of existing 2x lumber and anchors; removal of existing concrete; removal of existing steel angle and anchors; removal of existing concrete block and foundations below grade; and removal of all debris remaining from previous ramp demolition. 2. New Work: Construction of new brick veneer with corrugated wall ties at 1’-4” O/C; new brick soldier course to match existing brick and grout in size and color; new 4” concrete block brick ledge with corrugated wall ties at 1’-4” O/C; new concrete at existing door/threshold; new aluminum downspout including connection to existing stormwater management system; repair/rebuild of existing brick rowlock to match existing; replacement of sill plate and rim joists; and installation of compacted porous fill such as AASHTO No. 57 aggregate to grade within the limits of the existing ramp. Contractor shall provide proper shoring and protection of existing building materials to remain to prevent damage to existing materials. Complete improvements in proper sequencing as required to protect existing building materials to remain. No additional payment will be made for removal and replacement of materials beyond the limits shown on the Contract Drawings.
A1.00 are included within this item. This item generally consists of, but is not limited to, removal of existing brick veneer; removal of existing concrete block brick ledge down to existing foundations; removal of existing rim joist and sill plate; removal of existing downspout; removal of existing handrail and brackets; removal of existing 2x lumber and anchors; removal of existing concrete; removal of existing steel angle and anchors; removal of existing door trim; removal of existing concrete block and foundations below grade; and removal of all debris remaining from previous ramp demolition. 2. New Work: Construction of new cement board siding; new 1x PVC trim to match existing; new and/or salvaged brick veneer stacked to return back to existing wall at limits of cement board siding; new aluminum downspouts including connections to existing stormwater management system; cleaning, preparing, repairing/patching and painting existing CMU foundation wall block; tooth-in edge of CMU demolition with new CMU; replacement of sill plate and rim joists; and installation of compacted porous fill such as AASHTO No. 57 aggregate to grade within the limits of the existing ramp. Contractor shall provide proper shoring and protection of existing building materials to remain to prevent damage to existing materials. Complete improvements in proper sequencing as required to protect existing building materials to remain. No additional payment will be made for removal and replacement of materials beyond the limits shown on the Contract Drawings.
Buyer Attributes
Key metrics and characteristics
Census ID
Government ID for mapping buyers across datasets.
173804
Population
Population size to gauge opportunity scale.
155
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
CautiousAggressive
Higher is better Unlock
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
ConservativeEarly Adopter
Higher is better Unlock
Startup Friendliness
How often this buyer champions startups and early adoption.
Board meetings and strategic plans from Borough of Shippingport
Shippingport Borough Council Meeting
Date: Oct 6, 2026Type: Meeting mention
The council reviewed and approved several financial obligations, including payments for utility services and employee insurance renewals. Discussion topics included the status of fire department equipment installation, operational updates from the police department regarding trash management and fee collection, and upcoming road maintenance schedules. Progress reports were provided regarding the community building project, water and sewer infrastructure, and third-party permit applications. Representatives from the local power station presented plans for building demolition and new office construction. The council approved the schedule for trick-or-treat and authorized a technology agreement, while tabling decisions on several contract agreements and audit approvals. The meeting concluded with an executive session to discuss litigation.
Shippingport Borough Council Work Session
Date: Oct 19, 2026Type: Meeting mention
The scheduled work session was cancelled because a quorum was not present to proceed with the meeting.
Shippingport Borough Council Work Session Minutes
Date: Sep 21, 2026
Key Contacts
Public-sector contacts connected to Borough of Shippingport.
The council engaged in public discussion regarding meeting schedules and development projects. Key actions included the approval of the Phase 2 land development plan for Aligned Data Centers, contingent upon outstanding third-party permits, and authorization to advertise a draft ordinance establishing new addresses for the facility. The council also approved a water analysis, authorized an agreement for contractor parking near the sewage plant, and adopted a resolution to amend the building inspection fee schedule. Additionally, they discussed the status of the trash collection contract and scheduled local Trick or Treat activities, while concluding with an executive session regarding a police agreement and property maintenance.
Extracted from official board minutes, strategic plans, and video transcripts.
Meeting signals
Know what buyers discuss before RFPs drop
Track Borough of Shippingport meetings, strategic plans, and budget discussions before the public bid appears.