CountyFL
Posted
Nov 12, 2026
Dec 10, 2026
Property Appraiser Office Remodel (Rebid) RFP
Provide all labor, materials, equipment, supervision, and incidentals necessary to complete the interior renovation of the Property Appraiser Office.
Description: Work inlcudes sheriff's office remodel.
County · FL, US
Adjacent opportunities open for bidding right now.
CountyFL
Posted
Nov 12, 2026
Dec 10, 2026
Provide all labor, materials, equipment, supervision, and incidentals necessary to complete the interior renovation of the Property Appraiser Office.
Southern Nevada Water Authority
Special DistrictNV
Posted
Nov 18, 2026
Dec 3, 2026
Work consists of remodeling water quality office area located on the first floor, south wing of the laboratory building at the river mountains water treatment facility (rmwtf). By making the following improvements: convert the copier room into a wellness room;demolish three walls around the proposed center cubicles; convert two (2) offices into three (3) equally sized offices; install large glass windows on the existing lab manager s office, existing small conference room and three (3) proposed offices;convert the existing office into a small workgroup room; new paint, carpeting, cabinetry for the copy room, frosted nameplates and dimmable lighting. Other supporting work will include the modification of the fire sprinkler and alarm system, hvac system reconfiguration, replacing ceiling frames, tiles, baseboards, electrical system, and data and communication system upgrades and all other work.
Las Vegas Valley Water District
Special DistrictNV
Posted
Nov 18, 2026
Dec 3, 2026
Southern Nevada Water Authority invites qualified firms (Bidders) to submit Bids for the following Work, See Contract Documents for full details: The Site of the Work is located at the River Mountain Water Treatment Facility, 1350 Richard Bunker Ave., Henderson, NV 89015. The Work consists of remodeling the Southern Nevada Water Authority’s Water Quality Office area located on the first floor, south wing of the Laboratory Building at the River Mountains Water Treatment Facility (RMWTF). by making the following improvements: a. Convert the copier room into a wellness room; b. Demolish three walls around the proposed center cubicles; c. Convert two (2) offices into three (3) equally sized offices; d. Install large glass windows on the existing Lab Manager’s office, existing small conference room and three (3) proposed offices; e. Convert the existing office into a small workgroup room; f. New paint, carpeting, cabinetry for the Copy room, frosted nameplates and dimmable lighting. Other supporting work will include the modification of the fire sprinkler and alarm system, HVAC system reconfiguration, replacing ceiling frames, tiles, baseboards, electrical system, and data and communication system upgrades and all other Work, as described in the Engineer's estimate: $345,611 Questions regarding this bid must be directed to the Bid Contact listed in this Bid.
Wisconsin Department of Administration
State AgencyWI
Posted
Dec 15, 2025
Dec 2, 2026
In general, the work consists of the renovation and hardening of an existing 26 bed unit on the second floor of Stovall Hall. All doors on the unit will be replaced with anti-ligature hardware. Lights in the patient rooms will be replaced with tamper resistant fixtures. Bathrooms will be updated with ligature resistant plumbing fixtures and accessories. Audio surveillance and card access will be added to the unit as well.
Decision makers connected to this RFP from Madison County.
Solicitation files and supporting documents for this bid.