3871S RMWTF Water Quality Office Remodel RFP
Posted
Nov 18, 2026
Dec 3, 2026
Work consists of remodeling water quality office area located on the first floor, south wing of the laboratory building at the river mountains water treatment facility (rmwtf). By making the following improvements: convert the copier room into a wellness room;demolish three walls around the proposed center cubicles; convert two (2) offices into three (3) equally sized offices; install large glass windows on the existing lab manager s office, existing small conference room and three (3) proposed offices;convert the existing office into a small workgroup room; new paint, carpeting, cabinetry for the copy room, frosted nameplates and dimmable lighting. Other supporting work will include the modification of the fire sprinkler and alarm system, hvac system reconfiguration, replacing ceiling frames, tiles, baseboards, electrical system, and data and communication system upgrades and all other work.


