SNWA 3154S Calico Ridge ROFC Public Works
Posted
Sep 1, 2026
Sep 29, 2026
Work consists of the construction of a new 25 MGD rate of flow control station (ROFC) and associated supply pipeline. Scope of work includes - 12 LS rate of flow control station and below-grade structure; 1 LS yard piping; 1 LS yard and site access improvements and site work; 1 LS 36" feed pipeline; 1 LS electrical and instrumentation; see outside link.
