State AgencySD
Jun 23, 2026
Closes
Sep 10, 2026
Dam Maintenance & Pipe Spillway Repairs - Isabel Dam
Dam maintenance & pipe spillway repairs.
Description: This project is to repair the damage and surface failure on the pounds hollow dam. The contractor shall provide all labor, materials and equipment necessary to remove material from the surface failure areas, replace and compact the material to the existing grades and slopes of the surrounding dam and seed and mulch all disturbed areas.
Federal · DC, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
State AgencySD
Jun 23, 2026
Closes
Sep 10, 2026
Dam maintenance & pipe spillway repairs.
Jun 30, 2026
Closes
Aug 25, 2026
The work of this project involves reconstructing and repairing of a segment of the existing gravel road and a segment of the existing asphalt paved road, a riprap-lined roadside drainage ditch at a location on Buzzell Bridge Road, just east of the Union Village Dam is also included. The project will include an option bid item to complete the removal and disposal of existing asphalt pavement and the full depth hot mix asphalt replacement to the remaining asphalt paved road. As part of the base bid, the work will also include the full removal and offsite disposal of an existing large diameter pipe culvert with plastic flared end and the existing concrete drop inlet structure. The work also includes the installation of a new precast reinforced concrete box culvert, new precast reinforced concrete headwalls and wingwalls at the inlet and outlet ends of the new culvert and a new energy dissipator at the outlet end of the new culvert consisting of a rock riprap-lined stilling basin and rock riprap apron. Work will also include clearing and grubbing of trees and their offsite disposal, the removal and disposal of washed out, broken, and cracked existing asphalt pavement and removal silty subgrade soils, the removal, stockpiling, and reuse of existing 18-inch (d50) rock riprap, cleaning and re-adjustment to three existing concrete drop inlet structures and their plastic pipe culverts. The work will also include all necessary earthwork, such as, but not limited to excavation, filling, backfilling, trenching, compaction, and grading; placing topsoil and seeding at disturbed areas; and the placement, maintenance, inspection, and removal of erosion prevention and sedimentation controls measures.
Pennsylvania Department of General Services
State AgencyPA
Jul 24, 2026
Closes
Sep 8, 2026
The Pennsylvania Department of General Services (DGS), on behalf of the Pennsylvania Fish and Boat Commission, is issuing a Request for Proposals (RFP) for the Fords Lake Dam Dam Rehabilitation Project located at 1455 Fords Pond Rd, Clarks Summit, PA 18411 in Lackawanna County. The project involves general construction work to repair and rehabilitate the 17-ft high by 225-ft long combination earthen dam at Fords Pond, including sequencing construction on the roller-compacted earthen dam and existing spillways, controlling water from the existing dam structure during construction, and reinforcing concrete and dam joints on the existing spillway, with an estimated cost range of $2,000,000 to $3,000,000 and 270 calendar days duration. Proposals must be received by 2:00 PM on September 8, 2026, with a pre-proposal conference scheduled for August 7, 2026 at the Abington Community Library; Small Diverse Business (18%) and Veteran Business Enterprise (3%) participation goals apply.
Pennsylvania Department of General Services
State AgencyPA
Jul 24, 2026
Closes
Sep 8, 2026
The Pennsylvania Department of General Services (DGS), on behalf of the Pennsylvania Fish and Boat Commission, is issuing a Request for Proposals (RFP) for the Fords Lake Dam Dam Rehabilitation Project located at 1455 Fords Pond Rd, Clarks Summit, PA 18411 in Lackawanna County. The project involves general construction work to repair and rehabilitate the 17-ft high by 225-ft long combination earthen dam at Fords Pond, including sequencing construction on the roller-compacted earthen dam and existing spillways, controlling water from the existing dam structure during construction, and reinforcing concrete and dam joints on the existing spillway, with an estimated cost range of $2,000,000 to $3,000,000 and 270 calendar days duration. Proposals must be received by 2:00 PM on September 8, 2026, with a pre-proposal conference scheduled for August 7, 2026 at the Abington Community Library; Small Diverse Business (18%) and Veteran Business Enterprise (3%) participation goals apply.