Summary
Rehabilitation of approximately 21,000 LF of sanitary sewer main, inclusive of cleaning, CCTV inspections, heavy cleaning, and cured-in-place pipe (CIPP) lining, the rehabilitation of 40 manholes, including waterproof coating, patching, and rung replacement, and the bench and invert repair of 3 manholes. The project includes all necessary site clearing and sanitary bypass operations that shall be necessary in facilitating the installation of the CIPP lining into the sanitary system. This shall also include all the necessary connections to public water systems as needed to facilitate the use of hot water to cure the CIPP lining system and finalize. rehabilitation.