CityGA
Jul 28, 2026
Closes
Sep 3, 2026
Sewer System Improvements - Wastewater Treatment Plant
The construction of a 0.1 mgd wastewater treatment facility. Project includes the installation of a pre-engineered post-tensioned concrete tank and foundation, the installation of wastewater equipment including electrical work, the construction of a sludge wasting facility and related concrete work and the installation of (2) two pump stations and the installation of approximately 2,170 LF of a 4" HDPE effluent force main.