Sheffield - Improve Sanitary Sewer Infrastructure
Project consists of demolish the existing above-ground package lift station; rehabilitate the existing wetwell; furnish and install a new above-ground package duplex suction-lift lift station, complete with new 8-diameter precast concrete wetwell, site grading and stone, 6 security fencing, electrical service, and a SCADA/instrumentation system; furnish and install 4 SDR21 PVC force main and 8 steel casing pipe (open cut); 10 SDR26 PVC gravity sewer main (existing manhole MH01 to existing wetwell) and 12 SDR26 PVC gravity sewer main (existing wetwell to new wetwell).