Improve Campus Utilities Infrastructure - Electrical (RE-BID)
The project is generally described as the installation of a 13‑section lineup of 4.16 kV main‑tie‑main switchgear, positioned within an outdoor protected‑aisle enclosure and installed on a cable vault. The includes construction of underground ductbanks and installation of cables to provide feeders from the RED substation, a feeder tie-in to the CHP, associated distribution feeders, and reconfigure feeders to support construction phasing. The project also includes modifications to the RED substation to support the upgraded electrical infrastructure.