CityNY
Posted
Nov 25, 2026
Dec 16, 2026
WATER MAIN IMPROVEMENTS PROJECT DWSRF #19760 RFP
Construction of approximately 35,000 LF of new and replacement water main, water services, and fire hydrants.
Description: Ruben Segovia c/o Chatfield WSC is seeking sealed bids for the Segovia Water Improvements Project. The work consists of furnishing and installing approximately 1,880 LF of 3-inch SDR-21 CL200 PVC water line and associated appurtenances. Bids are due by 11:00 a.m. on December 10, 2026, and will be publicly opened at the Chatfield WSC office in Powell, Texas.
SpecialDistrict · TX, US
Adjacent opportunities open for bidding right now.
CityNY
Posted
Nov 25, 2026
Dec 16, 2026
Construction of approximately 35,000 LF of new and replacement water main, water services, and fire hydrants.
CountyOR
Posted
Nov 24, 2026
Dec 22, 2026
The City of Roseburg seeks a contractor to furnish all labor, equipment and materials to install an extension of the city storm water conveyance system. The work is organized into two bid schedules that include curb and gutter, catch basins and inlets, concrete manholes, 8-inch and 12-inch storm pipe (with associated trenching, backfill and surfacing), and Schedule B includes water main relocation work. Construction duration is 75 calendar days and the contract is a unit-price public works procurement subject to Oregon prevailing wage and other statutory public works requirements.
CityNY
Posted
Oct 28, 2026
Dec 2, 2026
A comprehensive improvements project for the water tower and the site. The project also includes the installation of flushing hydrants along the transmission main that fills the water tower. The project includes the comprehensive upgrade the elevated water storage tower and site, including select demolition, general site work, site piping work, the removal of coating on the interior and exterior of the existing water tower, application of a new coating on the tower, installation of a new TTHM removal system and mixer in the tower, installation of new chlorine chemical feed equipment. The construction of anew flow meter vault, the construction of a new building for specialty control valves, control panels and chemical storage, and all ancillary equipment and components, SCADA and integration for the project will be completed by the Owner through a separate professional service agreement.
CityWA
Posted
Nov 10, 2026
Dec 3, 2026
Work includes 85 TN temporary asphalt; 7,100 SF shoring or extra excavation class b; 30 CY controlled density fill (cdf); 10 CY removal and replacement of unstable base materials; 1400 LF cl 52 DI pipe for water main 8 in. Diam.; 1 LS abandonment of water main facilities; 20 ea replace 1 in. Water service with special connection; 280 LF cement conc. Traffic curb and gutter; 30 SY cement conc. Driveway entrance; 2 ea adjust monument case and cover; 1 EA reinstall survey monument; 60 tn temporary asphalt; 830 LF pvc sanitary sewer pipe 8 in. Diam; 1 LS erosion control and water pollution prevention.
Solicitation files and supporting documents for this bid.