Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Great Lakes Water Authority (GLWA) issued an RFB seeking contractors to perform mechanical repairs and improvements to Secondary Clarifier Areas at its Water Resource Recovery Facility, including pipe and valve replacements, magnetic flow meter installation, concrete repairs, and commissioning services. The procurement period of performance begins in August 2025 and the solicitation includes a questions deadline and multiple attachments (contract forms, specifications, drawings, and vendor instructions). The solicitation is an open RFB (not a grant) with an estimated value range of $5,000,000$10,000,000 and a closing date of March 5, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for the complete replacement of a final effluent pumping station, replacement of secondary clarifier mechanisms, piping improvements, site grading and landscaping, and associated structural and electrical work at the West Point Treatment Plant.
Posted Date
-
Due Date
Feb 19, 2026
Close: Feb 19, 2026
This RFP is for the complete replacement of a final effluent pumping station, replacement of secondary clarifier mechanisms, piping improvements, site grading and landscaping, and associated structural and electrical work at the West Point Treatment Plant.
AvailableProject consists of the demolition of the existing mechanical equipment for secondary clarifier numbers 1 and 2, the installation of new clarifier mechanisms and components, construction of a new flow distribution box with associated piping, and civil site improvements. See outside link.
Posted Date
Dec 18, 2025
Due Date
Feb 11, 2026
Release: Dec 18, 2025
Close: Feb 11, 2026
Project consists of the demolition of the existing mechanical equipment for secondary clarifier numbers 1 and 2, the installation of new clarifier mechanisms and components, construction of a new flow distribution box with associated piping, and civil site improvements. See outside link.
AvailableThe project generally consists of the addition of a new influent wet well Jockey pump with Variable Frequency Drive in the Operations building. Work includes piping, panel modification, process instrumentation and SCADA integration, as specified herein and as shown on the Drawings consisting of demolition, structural, process mechanical, electrical demolition and electrical.
Posted Date
Jan 16, 2026
Due Date
Feb 16, 2026
Release: Jan 16, 2026
Close: Feb 16, 2026
The project generally consists of the addition of a new influent wet well Jockey pump with Variable Frequency Drive in the Operations building. Work includes piping, panel modification, process instrumentation and SCADA integration, as specified herein and as shown on the Drawings consisting of demolition, structural, process mechanical, electrical demolition and electrical.
Repair work of mechanical units.
Posted Date
Jan 7, 2026
Due Date
Feb 6, 2026
Release: Jan 7, 2026
Close: Feb 6, 2026
Repair work of mechanical units.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis