CityMI
Jul 30, 2026
Closes
Aug 17, 2026
Richfield Township - Parking Lot Seal Coating RFP
Work includes seal coating & striping of the portion of the parking lots.
Description: Seal coating parking lots at the Administration and HHS Buildings. Sweep, blow and or clean all areas and curbing to prep for seal coating. Rout all cracks. Fill all cracks with rubberized crack filler. Seal with 2 coats of sealer. Stripe all parking, handicap stalls per existing overview maps. All areas will need to be completed on weekends due to weekly daily usage. All areas flagged off before and after to help keep traffic off while curing. Lots need to be ready for normal business operations each Monday after completion.
County · WI, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to Columbia County.
Adjacent opportunities open for bidding right now.
CityMI
Jul 30, 2026
Closes
Aug 17, 2026
Work includes seal coating & striping of the portion of the parking lots.
Northeast Regional Contracting
FederalPA
Aug 3, 2026
Closes
Aug 31, 2026
Restripe six (6) parking lots: a. 38 White Lines – 4” Wide x 20’ Length (Approx. 760 Linear Feet (LF)); b. Approx. 85 LF of 4” White crosshatching lines; c. Two (2) standard – International Symbol of Accessibility (No White Border) – color and size to match current VDOT Section 1300 – PM-10; d. 20 LF x 6” Blue line on Curb; e. 220 LF - 6” White Lines for crosswalk; f. 270 LF - 24” White Lines for crosswalk; g. Six (6) Straight White arrows sized to match per VODT – Section 1300 – PM-10; h. 10” W x 15’ Length - White Stop bar. See attached file.
Illinois Capital Development Board
State AgencyIL
Jul 28, 2026
Closes
Aug 18, 2026
Upgrade parking lots and roadways.
University Of Illinois At Chicago
Higher EducationIL
Jul 8, 2026
Closes
Aug 13, 2026
Construction shall include all labor, materials, equipment, transportation, and operations necessary to complete the site work improvements as shown on the Drawings. This project will reconstruct two parking lots located near the southeast and southwest corners of Gies Memorial Stadium. The curved brick retaining wall around the south horseshoe of the stadium exterior will be replaced and a new driveway and south gate will be constructed to the south stadium tunnel. The north sidewalk along Kirby Avenue will be replaced and pavers will be added to the parkway. New accessible entrances and ramps will connect the parking lot improvements to the adjacent lower building areas at the stadium. The southeast vehicular ramp along the east concourse of the stadium will be replaced, and a new loading dock will be retrofit along the west side of the ramp. There will also be improvements to the lighting, landscaping, fencing, storm sewers, and retaining walls within the area. Refer to Division 01 of the technical specifications for a complete, detailed breakdown of the base bids and alternates for this project.