Summary
Construction shall include all labor, materials, equipment, transportation, and operations necessary to complete the site work improvements as shown on the Drawings. This project will reconstruct two parking lots located near the southeast and southwest corners of Gies Memorial Stadium. The curved brick retaining wall around the south horseshoe of the stadium exterior will be replaced and a new driveway and south gate will be constructed to the south stadium tunnel. The north sidewalk along Kirby Avenue will be replaced and pavers will be added to the parkway. New accessible entrances and ramps will connect the parking lot improvements to the adjacent lower building areas at the stadium. The southeast vehicular ramp along the east concourse of the stadium will be replaced, and a new loading dock will be retrofit along the west side of the ramp. There will also be improvements to the lighting, landscaping, fencing, storm sewers, and retaining walls within the area. Refer to Division 01 of the technical specifications for a complete, detailed breakdown of the base bids and alternates for this project.