Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project generally consists of but is not limited to: Removal and disposal of existing anthracite, support gravel, and underdrains; demolition, removal and disposal of existing nozzle underdrain tiles; Demolition, removal, and disposal of raised relief on concrete filter bottom; pour back of a minimum of 5" of 5000 psi concrete to specified elevation (scarify as needed to ensure minimum 5" of depth); surface preparation of all specified surfaces of the filter basin; replacement of existing concrete joint seals; application of protective coating to all specified surfaces of the filter basin; installation of new, Owner furnished, underdrains, installation of owner furnished silica filter sand and anthracite filter media; and all associated work (“Work”) as indicated in the Contract Documents and Specifications on filters #6. Additionally, at this location, the project generally consists of but is not limited to: Removal and disposal of existing anthracite, support gravel, and underdrains; surface preparation of all specified surfaces of the filter basin; replacement of existing concrete joint seals; application of protective coating to all specified surfaces of the filter basin; installation of new, Owner furnished, underdrains, installation of new, owner furnished silica filter sand and anthracite filter media; and all associated work (“Work”) as indicated in the Contract Documents and Specifications on filters #7 through #10.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This solicitation seeks contractors for the International Swim Center Rehabilitation Phase 2 project in Santa Clara, California, to complete Phase 2 construction and related facility improvements. The project scope includes rehabilitation of pools and associated mechanical systems, ADA and site/access improvements, and construction/repair of accessory buildings (Phase 2 elements such as a new administrative/community building and bleacher/canopy repairs). Bidding opened on 2025-12-23 and closes on 2026-02-19 at 3:00 PM PST; full solicitation documents and contact information are available on the buyer’s posting (vendor registration may be required).
Posted Date
Dec 23, 2025
Due Date
Feb 19, 2026
Release: Dec 23, 2025
Close: Feb 19, 2026
This solicitation seeks contractors for the International Swim Center Rehabilitation Phase 2 project in Santa Clara, California, to complete Phase 2 construction and related facility improvements. The project scope includes rehabilitation of pools and associated mechanical systems, ADA and site/access improvements, and construction/repair of accessory buildings (Phase 2 elements such as a new administrative/community building and bleacher/canopy repairs). Bidding opened on 2025-12-23 and closes on 2026-02-19 at 3:00 PM PST; full solicitation documents and contact information are available on the buyer’s posting (vendor registration may be required).
AvailableWork includes 1 LS ponds vegetation removal; 1 LS demolition of pond 1 and pond 2 appurtenances and sludge removal; 1 LS ponds 1 and pond 2 rehabilitation; 1 LS influent and effluent transfer piping and structures.
Posted Date
Nov 10, 2025
Due Date
Jan 22, 2026
Release: Nov 10, 2025
Close: Jan 22, 2026
Work includes 1 LS ponds vegetation removal; 1 LS demolition of pond 1 and pond 2 appurtenances and sludge removal; 1 LS ponds 1 and pond 2 rehabilitation; 1 LS influent and effluent transfer piping and structures.
AvailableSeeking proposals for sewer line inspection, rehabilitation, and pump station rehabilitation services for the Town of Artesia, Mississippi Sewer System Rehabilitation - Phase 2 project.
Posted Date
Dec 18, 2025
Due Date
Jan 21, 2026
Release: Dec 18, 2025
Close: Jan 21, 2026
Seeking proposals for sewer line inspection, rehabilitation, and pump station rehabilitation services for the Town of Artesia, Mississippi Sewer System Rehabilitation - Phase 2 project.
AvailableWork consists of rehabilitation and/or replacement of 6" and 8" sewer mains, approx 13,311 LF by pipe bursting and 994 LF by open-cut. Also included rehabilitation or replacement of approx 368 lower laterals, 358 upper laterals, and approximately 60 sewer structures in the project area.
Posted Date
Nov 5, 2025
Due Date
Jan 13, 2026
Release: Nov 5, 2025
Close: Jan 13, 2026
Work consists of rehabilitation and/or replacement of 6" and 8" sewer mains, approx 13,311 LF by pipe bursting and 994 LF by open-cut. Also included rehabilitation or replacement of approx 368 lower laterals, 358 upper laterals, and approximately 60 sewer structures in the project area.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis