Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 LS ponds vegetation removal; 1 LS demolition of pond 1 and pond 2 appurtenances and sludge removal; 1 LS ponds 1 and pond 2 rehabilitation; 1 LS influent and effluent transfer piping and structures.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The County of Napa (for the Lake Berryessa Resort Improvement District) is soliciting bids for the Phase 2 Wastewater Ponds Rehabilitation Project (LB 18-02), including vegetation removal, demolition and replacement of piping/structures, reconstruction of pond dikes, and installation of new gravity mains and related appurtenances. This is an Invitation for Bid with a mandatory pre‑bid site visit on December 2, 2025, and bids due December 18, 2025 at 11:30 AM PT via the County’s e‑Procurement portal.
Posted Date
Nov 10, 2025
Due Date
Dec 18, 2025
Release: Nov 10, 2025
Close: Dec 18, 2025
The County of Napa (for the Lake Berryessa Resort Improvement District) is soliciting bids for the Phase 2 Wastewater Ponds Rehabilitation Project (LB 18-02), including vegetation removal, demolition and replacement of piping/structures, reconstruction of pond dikes, and installation of new gravity mains and related appurtenances. This is an Invitation for Bid with a mandatory pre‑bid site visit on December 2, 2025, and bids due December 18, 2025 at 11:30 AM PT via the County’s e‑Procurement portal.
Premium
Access the largest public sector contact database
Construction of the Asset Renewal Project Phase 2, Baldwinsville-Seneca Knolls Wastewater Treatment Plant Contract No. 2A - General Construction, Contract No. 2B Electrical Construction, and Contract No. 2C Heating and Ventilating Construction. The project generally consists of: Process Drain and Influent Sampler Relocation Primary Sludge Degritter Replacement RAS and WAS Flow Metering Upgrades Replacement of Aeration Purge Blowers Replacement of Belt Filter Presses and Upgrades to Sludge Loadout Replacement of Process Water Pumps Slide Gate Replacements throughout the WWTP SCADA Upgrades throughout WWTP HVAC and Electrical Updates throughout WWTP Miscellaneous Concrete and Structural Repairs throughout WWTP Architectural Update to WWTP Building Site/Civil Improvements through WWTP.
Posted Date
Oct 23, 2025
Due Date
Dec 23, 2025
Release: Oct 23, 2025
Close: Dec 23, 2025
Construction of the Asset Renewal Project Phase 2, Baldwinsville-Seneca Knolls Wastewater Treatment Plant Contract No. 2A - General Construction, Contract No. 2B Electrical Construction, and Contract No. 2C Heating and Ventilating Construction. The project generally consists of: Process Drain and Influent Sampler Relocation Primary Sludge Degritter Replacement RAS and WAS Flow Metering Upgrades Replacement of Aeration Purge Blowers Replacement of Belt Filter Presses and Upgrades to Sludge Loadout Replacement of Process Water Pumps Slide Gate Replacements throughout the WWTP SCADA Upgrades throughout WWTP HVAC and Electrical Updates throughout WWTP Miscellaneous Concrete and Structural Repairs throughout WWTP Architectural Update to WWTP Building Site/Civil Improvements through WWTP.
AvailableTrail phase 2 project.
Posted Date
Nov 24, 2025
Due Date
Dec 16, 2025
Release: Nov 24, 2025
Close: Dec 16, 2025
Trail phase 2 project.
AvailableWork consists of rehabilitation and/or replacement of 6" and 8" sewer mains, approx 13,311 LF by pipe bursting and 994 LF by open-cut. Also included rehabilitation or replacement of approx 368 lower laterals, 358 upper laterals, and approximately 60 sewer structures in the project area.
Posted Date
Nov 5, 2025
Due Date
Jan 13, 2026
Release: Nov 5, 2025
Close: Jan 13, 2026
Work consists of rehabilitation and/or replacement of 6" and 8" sewer mains, approx 13,311 LF by pipe bursting and 994 LF by open-cut. Also included rehabilitation or replacement of approx 368 lower laterals, 358 upper laterals, and approximately 60 sewer structures in the project area.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis