Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Thomasville City School District
Roof replacement Bldg. 100 (+/- 38,000 SF): Two roofs in place. Remove two roof assemblies down to original zonolite lightweight insulating vermiculite fill over metal formdeck. Install new temporary roof, lightweight insulating cellular concrete (LWIC) fill with insulporm rigid insulation board and fleece-back single ply membrane adhered to LWIC. 2. Roof recover Bldgs. 200, 201, 202, 300 & 400 Gym (+/- 16,100 SF): One single ply roof assembly in place. Existing roof to remain. Install new single ply assembly consisting of rigid insulation board, cover board and single ply membrane (adhered). Coverboard mechanically attached to existing structural metal deck. 3. Install overflow roof drains and storm drain piping at Bldg. 100.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Rockdale County Public School District
Re-roofing select roof sections of an existing school system facility, an area of approximately 32,500+/- SF. Work includes, but is not limited to, removal of old roof and installation of a new roof system on an occupied building.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Rockdale County Public School District
Close: Dec 18, 2025
Re-roofing select roof sections of an existing school system facility, an area of approximately 32,500+/- SF. Work includes, but is not limited to, removal of old roof and installation of a new roof system on an occupied building.
AvailableRockdale County Public School District
The scope of the project consists of re-roofing select roof sections of an existing school system facility, an area of approximately 32,500+/- SF. Work includes, but is not limited to, removal of old roof and installation of a new roof system on an occupied building.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Rockdale County Public School District
Close: Dec 18, 2025
The scope of the project consists of re-roofing select roof sections of an existing school system facility, an area of approximately 32,500+/- SF. Work includes, but is not limited to, removal of old roof and installation of a new roof system on an occupied building.
AvailableRegional School Unit 21
Complete replacement of asphalt shingles on the elementary school. The estimated roof area to be replaced is approximately 228,000 SF. This project aims to ensure the long-term structural integrity and weatherproofing of the school building.
Posted Date
-
Due Date
Jan 19, 2026
Regional School Unit 21
Close: Jan 19, 2026
Complete replacement of asphalt shingles on the elementary school. The estimated roof area to be replaced is approximately 228,000 SF. This project aims to ensure the long-term structural integrity and weatherproofing of the school building.
AvailableSt. Clair County School District
Roof replacement.
Posted Date
Nov 8, 2025
Due Date
Nov 20, 2025
Release: Nov 8, 2025
St. Clair County School District
Close: Nov 20, 2025
Roof replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis