Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The scope of work includes construction of approx. 3,200 LF of 12" ductile iron water main, hydrants and appurtenances. The work shall include replacement of all water services and abandonment of existing water main. 6,800 SY cold planing, ty 1. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of approx. 55 LF of 12" water main, 7" temp pavement replacement, slurry backfill; 366 LF of 8" water main, 7" temp pavement replacement, slurry backfill; 1,333 LF of 8" water main, type 8 pavement replacement, granular backfill; 1,132 LF of 8" water main, type A pavement replacement, granular backfill; 288 LF of 8" water main, temp conc cap pavement replacement, granular backfill 6.
Posted Date
Jan 22, 2026
Due Date
Feb 9, 2026
Release: Jan 22, 2026
Close: Feb 9, 2026
Work consists of approx. 55 LF of 12" water main, 7" temp pavement replacement, slurry backfill; 366 LF of 8" water main, 7" temp pavement replacement, slurry backfill; 1,333 LF of 8" water main, type 8 pavement replacement, granular backfill; 1,132 LF of 8" water main, type A pavement replacement, granular backfill; 288 LF of 8" water main, temp conc cap pavement replacement, granular backfill 6.
AvailableThis RFP is for the replacement of approximately 5,400 linear feet of water main with new 10-inch PVC water main and associated roadway, swale, and shoulder restoration.
Posted Date
Jan 22, 2026
Due Date
Mar 5, 2026
Release: Jan 22, 2026
Close: Mar 5, 2026
This RFP is for the replacement of approximately 5,400 linear feet of water main with new 10-inch PVC water main and associated roadway, swale, and shoulder restoration.
AvailableAbout 10,000 LF of 8" water main replacement; 4,400 SY of 9" base concrete with 1.5" Asphalt surface, including valves, hydrants and pavement restoration.
Posted Date
Jan 22, 2026
Due Date
Feb 9, 2026
Release: Jan 22, 2026
Close: Feb 9, 2026
About 10,000 LF of 8" water main replacement; 4,400 SY of 9" base concrete with 1.5" Asphalt surface, including valves, hydrants and pavement restoration.
AvailableWater Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
Posted Date
Dec 14, 2025
Due Date
Jan 28, 2026
Release: Dec 14, 2025
Close: Jan 28, 2026
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →