Sweetwater Union High School District
School DistrictCA
Posted
Oct 9, 2026
Nov 19, 2026
Sweetwater High School Fire Door Replacement Project RFP
Work includes replacement at high school of five fire doors.
Description: The purpose of this contract is to secure firm and fixed pricing for the labor and equipment necessary to replace door hardware at the three schools listed in the Specifications section of the Bid 4211JL School Door Hardware Replacement Project for Multiple Schools - REQUIRED FORMS document. The awarded vendor must be able to both supply and install any hardware purchased from this bid, and all projects must be completed by July 31, 2027. Please read the attachment named "Bid 4211JL School Door Hardware Replacement Project for Multiple Schools - TERMS AND CONDITIONS," and print out the attachment named "Bid 4211JL School Door Hardware Replacement Project for Multiple Schools - REQUIRED FORMS." Read the Specifications, complete the forms, and submit those forms along with the completed Proposal Form on VendorLink before the due date and time. Download “Bid 4211JL School Door Hardware Replacement Project for Multiple Schools - PROPOSAL FORM.xlsx” from the VendorLink website where you downloaded this bid document. Complete the Proposal Form document and upload the completed Excel file onto VendorLink along with all required bid submission documents. Do not email your Bid Proposal Form to the MCPS Purchasing Department.
SchoolDistrict · FL, US
Adjacent opportunities open for bidding right now.
Sweetwater Union High School District
School DistrictCA
Posted
Oct 9, 2026
Nov 19, 2026
Work includes replacement at high school of five fire doors.
CityCA
Posted
Oct 8, 2026
Nov 17, 2026
Furnishing and installation of new roofing systems utilizing garland roofing materials and systems specified herein. Work at city hall shall also include the removal of the existing tile roofing system in the areas designated for replacement and the installation of a new metal seam roofing system, as specified herein. The work shall include all required roof preparation, substrate preparation, repairs, flashing, penetrations, accessories, and other related work necessary for the complete installation of the new roofing systems.
New York Metropolitan Transportation Authority
State AgencyNY
Posted
Nov 5, 2026
Dec 29, 2026
Engineering design services for component replacements at multiple LIRR stations, divided into four projects.
Special DistrictMA
Posted
Oct 18, 2026
Nov 24, 2026
The project consists of: window and exterior door replacement in 36 occupied housing units and community building.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Marion County Public Schools.