Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consist of approx 1,125 CY of excavation; 490 LF of 8" PVC SDR 35 sanitary sewer; 325 LF of 12 HDPE storm sewer; 337 LF of 10" C-900 PVC water main; 1,280 SF of 5" concrete sidewalk W/ 4"-3/4" base aggregate; 630 LF of 30" concrete curb and gutter. Traffic control; 222 LF silt fence; 4 EA inlet protection type D; 417 LF sawcut pavement/concrete; 2 EA end section removal; 28 LF 18" CMP removal; 1 EA existing sign to be relocated; 1,125 CY excavation; 115 CY excavation below subgrade (EBS); 230 TN 3" dense graded base course (for EBS); 620 LF 8" PVC sdr35 sanitary sewer; 43 LF 6" PVC sdr35 sanitary lateral; 3 ea 4' dia. Sanitary manhole w/ casting; 325 LF 12" HDPE storm sewer; 42 LF 15" HDPE storm sewer; 96 LF 18" HDPE culvert. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Drive extension. Improve accessibility for pedestrian, bicycle, and vehicular connections to the drive light rail station as well as promote economic development by providing infrastructure to support and encourage transit supportive development. Complete street that includes upgraded pedestrian and bicycle facilities. This project will provide upgraded sidewalks, bike lanes, planting strips, pedestrian lighting, and street trees to achieve usdg guidelines. Work includes construction of concrete sidewalk, curb and gutter, paving, grading, drainage, retaining walls, culverts, erosion control, and utilities. See outside link.
Posted Date
Nov 26, 2025
Due Date
Jan 30, 2026
Release: Nov 26, 2025
Close: Jan 30, 2026
Drive extension. Improve accessibility for pedestrian, bicycle, and vehicular connections to the drive light rail station as well as promote economic development by providing infrastructure to support and encourage transit supportive development. Complete street that includes upgraded pedestrian and bicycle facilities. This project will provide upgraded sidewalks, bike lanes, planting strips, pedestrian lighting, and street trees to achieve usdg guidelines. Work includes construction of concrete sidewalk, curb and gutter, paving, grading, drainage, retaining walls, culverts, erosion control, and utilities. See outside link.
AvailableProvide engineering and technical services for the carlyss drive north extension project.
Posted Date
Jan 13, 2026
Due Date
Feb 3, 2026
Release: Jan 13, 2026
Close: Feb 3, 2026
Provide engineering and technical services for the carlyss drive north extension project.
AvailableWork includes 1900 LF, furnish and install reinforced filter fabric barrier, complete in place; 112 SY, furnish and install stabilized construction access, complete in place; 803 LF, site restoration; 803 LF, furnish and install trench safety system for water line construction, complete in place; 596 LF, furnish and install 12IN dia. waterline by open cut, including all bends, fittings, valves, and appurtenances, complete in place; 167 LF, furnish and install 12 IN dia. waterline by open cut with restrained joints including all bends, fittings, valves, and appurtenances, complete in place; 120 LF, 12 IN dia. fusible PVC pipe waterline in 24 IN HDPE casing by trenchless construction, including all bends, fittings, complete in place. See attached files.
Posted Date
Jan 7, 2026
Due Date
Jan 28, 2026
Release: Jan 7, 2026
Close: Jan 28, 2026
Work includes 1900 LF, furnish and install reinforced filter fabric barrier, complete in place; 112 SY, furnish and install stabilized construction access, complete in place; 803 LF, site restoration; 803 LF, furnish and install trench safety system for water line construction, complete in place; 596 LF, furnish and install 12IN dia. waterline by open cut, including all bends, fittings, valves, and appurtenances, complete in place; 167 LF, furnish and install 12 IN dia. waterline by open cut with restrained joints including all bends, fittings, valves, and appurtenances, complete in place; 120 LF, 12 IN dia. fusible PVC pipe waterline in 24 IN HDPE casing by trenchless construction, including all bends, fittings, complete in place. See attached files.
The work includes the construction of ada compliant ramps within the project limits. Additionally, the work includes water main installation and new storm sewer and stormwater management facilities.
Posted Date
Dec 5, 2025
Due Date
Jan 29, 2026
Release: Dec 5, 2025
Close: Jan 29, 2026
The work includes the construction of ada compliant ramps within the project limits. Additionally, the work includes water main installation and new storm sewer and stormwater management facilities.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis