Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Hartford
Court resurface at the Willowbrook Park tennis and basketball courts which includes cleaning of the existing court surface, surface repairs, filler coat, acrylic color coat resurface, line marking, expansion joint filling per the base project and the alternate project specifications. Contractor to provide all labor, equipment and materials for the court resurfacing.
Posted Date
Mar 17, 2026
Due Date
Apr 7, 2026
Release: Mar 17, 2026
City of Hartford
Close: Apr 7, 2026
Court resurface at the Willowbrook Park tennis and basketball courts which includes cleaning of the existing court surface, surface repairs, filler coat, acrylic color coat resurface, line marking, expansion joint filling per the base project and the alternate project specifications. Contractor to provide all labor, equipment and materials for the court resurfacing.
AvailableCity of Hartford
The project includes 403 LF of 8" PVC SDR 35 sanitary sewer main, 531 LF of 6" PVC SDR 35 sanitary sewer service lateral, 460 LF of 1.25" HDPE water service pipe, 1 each fire hydrant assembly, 760 LF of 12" HDPE storm sewer, 1,000 CY of common excavation, 2,600 tons of crushed aggregate base for the roadway, 220 tons of 1.75" HMA pavement upper layer, 280 tons of 2.25" HMA pavement lower layer, 1,330 LF of 30" concrete curb and gutter, 4,800 SF of 4" concrete sidewalk, 3,000 SF of 6" concrete sidewalk and driveway, and 850 SY of restoration.
Posted Date
Mar 10, 2026
Due Date
Mar 26, 2026
Release: Mar 10, 2026
City of Hartford
Close: Mar 26, 2026
The project includes 403 LF of 8" PVC SDR 35 sanitary sewer main, 531 LF of 6" PVC SDR 35 sanitary sewer service lateral, 460 LF of 1.25" HDPE water service pipe, 1 each fire hydrant assembly, 760 LF of 12" HDPE storm sewer, 1,000 CY of common excavation, 2,600 tons of crushed aggregate base for the roadway, 220 tons of 1.75" HMA pavement upper layer, 280 tons of 2.25" HMA pavement lower layer, 1,330 LF of 30" concrete curb and gutter, 4,800 SF of 4" concrete sidewalk, 3,000 SF of 6" concrete sidewalk and driveway, and 850 SY of restoration.
AvailableCity of Hartford
Sanitary sewer service lateral, pvc sdr 35, 6 303 lf\r water main, pvc pressure pipe, 8 1254 lf\r water service pipe, hdpe, 1. 25 173 lf\r fire hydrant asssembly- 2 each\r temporary water system 1 ls\r storm sewer, 15 -18 , 760 lf\r removal of sidewalks and driveways 573 sy\r removal of curb and gutter 1241 lf\r saw cutting 464 lf\r asphalt pavement removal 3137 sy\r common excavation 2000 cy\r crushed aggregate base, roadway 2778 tons\r hma pavement, 5 lt 58-28 s, upper layer, 1. 75 338 tons\r hma pavement, 3 lot 58-28 s, lower layer, 2. 25 435 tons\r concrete curb and gutter, 24 barrier 1366 lf\r concrete curb and gutter, 30 barrier 995 lf\r concrete sidewalk, 4 3274 sf\r concrete sidewalk and driveway, 7 2166 sf\r temporary silt fence 1130 lf\r restoration 1860 sy.
Posted Date
Feb 24, 2026
Due Date
Mar 11, 2026
Release: Feb 24, 2026
City of Hartford
Close: Mar 11, 2026
Sanitary sewer service lateral, pvc sdr 35, 6 303 lf\r water main, pvc pressure pipe, 8 1254 lf\r water service pipe, hdpe, 1. 25 173 lf\r fire hydrant asssembly- 2 each\r temporary water system 1 ls\r storm sewer, 15 -18 , 760 lf\r removal of sidewalks and driveways 573 sy\r removal of curb and gutter 1241 lf\r saw cutting 464 lf\r asphalt pavement removal 3137 sy\r common excavation 2000 cy\r crushed aggregate base, roadway 2778 tons\r hma pavement, 5 lt 58-28 s, upper layer, 1. 75 338 tons\r hma pavement, 3 lot 58-28 s, lower layer, 2. 25 435 tons\r concrete curb and gutter, 24 barrier 1366 lf\r concrete curb and gutter, 30 barrier 995 lf\r concrete sidewalk, 4 3274 sf\r concrete sidewalk and driveway, 7 2166 sf\r temporary silt fence 1130 lf\r restoration 1860 sy.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $25,000, use sole source.
Coops: Lead with a cooperative purchase via Sourcewell or eligible Wisconsin state contracts to avoid a formal bid.
City of Hartford (WI): No documented sole source awards in public records.
Board meetings and strategic plans from City of Hartford
The committee discussed and approved an increase in the Veterans Memorial Aquatic Center fees for the 2026 season, affecting both daily and seasonal passes for residents and non-residents to better align with operational costs. Additionally, the committee approved the appointment of city staff to serve as Deputy Property Maintenance Code Officials, a measure intended to support the enforcement of municipal property maintenance code violations.
The council discussed rescheduling the upcoming April meeting to comply with organizational requirements and reviewed a transient merchant license application. Key actions included the approval of liquor and malt beverage licenses for a local business, the acceptance of funds from the Washington County EMS and Fire Rescue Grant Program, and the adoption of an ordinance amending the municipal code regarding stop intersections to improve traffic safety. Additionally, the council approved a lease agreement for a parking lot with the local high school.
The commission confirmed the promotion of a fire official to Lieutenant and the appointment of a new paid-on-call firefighter. Following a closed session to review the Lieutenant recruitment process, the commission established a current eligibility list for the position of Lieutenant and confirmed the promotion of a Sergeant to Police Lieutenant.
The committee received an update regarding recent water main breaks and an electrical service interruption. Additionally, the committee reviewed and approved a proposal for J&H Heating to install a new Trane rooftop heating and air conditioning unit at a cost of $27,957.00 due to the failure of the existing 25-year-old system.
The agenda for the Hartford City Plan Commission meeting scheduled for March 9, 2026, detailed several key discussion and consideration items. Major topics included two separate petitions for Direct Annexation by Unanimous Consent: one submitted by Winter Park Builders, LLC for approximately 58.0670 acres, and another submitted by the City of Hartford for approximately 1.472 acres. The commission was also scheduled to discuss and consider a Site Plan and Architectural Review for Tommy Express Car Wash at 1310 E. Sumner Street, and a Site Plan Review for an expansion of a refuse storage area for Garibaldi Mexican Bar and Grill. Furthermore, the agenda included consideration for a Final Plat of Copper Trails Phase 2, and two separate Rezoning considerations: one from A-1 to M-2 zoning, and another from C-1 to I-1 zoning for parcels on North Pike Lake Drive. The document also contains minutes from the February 9, 2026 meeting, which included the approval of a Conditional Use Permit for a Community cultural facility at 57 North Main Street, and an informational report on the New Housing Fee Report under Wis. Stat. §66.0014.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Hartford's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database