Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
City of Oak Ridge solicits bids for construction of the Scarboro 85 monument at A.K. Bissell Park. Work includes complete monument construction and site work per plans/specs (mobilization, erosion control, seeding, earthwork, cast-in-place concrete, rammed earth walls or approved equivalents, landscaping, site furnishings, electrical/lighting, installation of content/exhibits, and a maintenance plan). Procurement requires a Tennessee contractor license, 10% bid guarantee, 100% performance and labor & material bonds, specified insurance, 5% retainage, liquidated damages ($500/day), and completion within 270 calendar days from Notice to Proceed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction and Installation of Two (2) Non-illuminated Monument-style Ground Signs. The signs shall be constructed as monument-style structures not to exceed 20 feet in height and 20 feet in width, engineered to TxDOT specifications.
Posted Date
Dec 8, 2025
Due Date
Jan 12, 2026
Release: Dec 8, 2025
Close: Jan 12, 2026
Construction and Installation of Two (2) Non-illuminated Monument-style Ground Signs. The signs shall be constructed as monument-style structures not to exceed 20 feet in height and 20 feet in width, engineered to TxDOT specifications.
AvailableNew monument signage for park and install sprinkler system which will operate in an efficient and satisfactory manner so that the finished system shall efficiently irrigate all areas to be covered and shall prove satisfactory. See attached file for full scope.
Posted Date
Sep 10, 2025
Due Date
Jan 15, 2026
Release: Sep 10, 2025
Close: Jan 15, 2026
New monument signage for park and install sprinkler system which will operate in an efficient and satisfactory manner so that the finished system shall efficiently irrigate all areas to be covered and shall prove satisfactory. See attached file for full scope.
AvailableWork includes: abandoning BWL Wells 85-01, 85-02, and 85-03, which are screened Type 1 community wells with no pumps or internal equipment and equipped with pitless adapters. Work includes full mobilization, setup, abandonment to grade, demobilization, and reporting the abandoned status to the State of Michigan in accordance with the Michigan Water Well Construction and Pump Installation Code (Part 127, Act 368, PA 1978; Rules R 325.1662–1670). Contractor must provide lump-sum pricing based on existing well information, supply unit pricing per cubic foot of fill material for volume variances, account for 20% grout loss through the screen, and save/present cement/material slips for verification. Expected fill volumes are 657.38 ft³ for Well 85-01, 150.21 ft³ for Well 85-02, and 185.55 ft³ for Well 85-03.
Posted Date
Nov 18, 2025
Due Date
Dec 19, 2025
Release: Nov 18, 2025
Close: Dec 19, 2025
Work includes: abandoning BWL Wells 85-01, 85-02, and 85-03, which are screened Type 1 community wells with no pumps or internal equipment and equipped with pitless adapters. Work includes full mobilization, setup, abandonment to grade, demobilization, and reporting the abandoned status to the State of Michigan in accordance with the Michigan Water Well Construction and Pump Installation Code (Part 127, Act 368, PA 1978; Rules R 325.1662–1670). Contractor must provide lump-sum pricing based on existing well information, supply unit pricing per cubic foot of fill material for volume variances, account for 20% grout loss through the screen, and save/present cement/material slips for verification. Expected fill volumes are 657.38 ft³ for Well 85-01, 150.21 ft³ for Well 85-02, and 185.55 ft³ for Well 85-03.
Monument signs replacements at multiple locations.
Posted Date
Nov 20, 2025
Due Date
Dec 17, 2025
Release: Nov 20, 2025
Close: Dec 17, 2025
Monument signs replacements at multiple locations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis