Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Willis
Construction and Installation of Two (2) Non-illuminated Monument-style Ground Signs. The signs shall be constructed as monument-style structures not to exceed 20 feet in height and 20 feet in width, engineered to TxDOT specifications.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Franklin Special School District
Monument signs replacements at multiple locations.
Posted Date
Nov 20, 2025
Due Date
Dec 17, 2025
Release: Nov 20, 2025
Franklin Special School District
Close: Dec 17, 2025
Monument signs replacements at multiple locations.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Minden
Project involves construction of a new two-million- gallon prestressed concrete ground storage tank and water booster pump station. All site work, site piping, tank construction, booster pump station construction, and electrical work are included in this project.
Posted Date
Nov 5, 2025
Due Date
Dec 16, 2025
Release: Nov 5, 2025
City of Minden
Close: Dec 16, 2025
Project involves construction of a new two-million- gallon prestressed concrete ground storage tank and water booster pump station. All site work, site piping, tank construction, booster pump station construction, and electrical work are included in this project.
AvailableCentralia College
Provide two (2) lincoln electric flextec 350x construction welders, model number k4271-2 and accessories.
Posted Date
Dec 1, 2025
Due Date
Dec 11, 2025
Release: Dec 1, 2025
Centralia College
Close: Dec 11, 2025
Provide two (2) lincoln electric flextec 350x construction welders, model number k4271-2 and accessories.
Available245-Network Contract Office 5 (36C245)
To replace two existing pedestal-style steam condensate pumps (pump p-1 and pump p-2) with new, specified pump models, ensuring the reliable and efficient return of steam condensate to the boiler system. This includes all necessary mechanical, electrical, and piping modifications. Pre-Installation and Safety: Safety Plan: Develop and submit a site-specific safety plan (including Lockout/Tagout procedures). System Shutdown: Coordinate and execute the safe shutdown, isolation, and draining of the condensate return system and associate steam/utility lines for the existing pumps. Containment: Provide necessary containment and temporary bypass for condensate overflow, if required, to ensure continuous facility operation where possible. See attached file.
Posted Date
Dec 9, 2025
Due Date
Dec 23, 2025
Release: Dec 9, 2025
245-Network Contract Office 5 (36C245)
Close: Dec 23, 2025
To replace two existing pedestal-style steam condensate pumps (pump p-1 and pump p-2) with new, specified pump models, ensuring the reliable and efficient return of steam condensate to the boiler system. This includes all necessary mechanical, electrical, and piping modifications. Pre-Installation and Safety: Safety Plan: Develop and submit a site-specific safety plan (including Lockout/Tagout procedures). System Shutdown: Coordinate and execute the safe shutdown, isolation, and draining of the condensate return system and associate steam/utility lines for the existing pumps. Containment: Provide necessary containment and temporary bypass for condensate overflow, if required, to ensure continuous facility operation where possible. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →