Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Franklin Special School District
Monument signs replacements at multiple locations.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Willis
Construction and Installation of Two (2) Non-illuminated Monument-style Ground Signs. The signs shall be constructed as monument-style structures not to exceed 20 feet in height and 20 feet in width, engineered to TxDOT specifications.
Posted Date
Dec 8, 2025
Due Date
Jan 12, 2026
Release: Dec 8, 2025
City of Willis
Close: Jan 12, 2026
Construction and Installation of Two (2) Non-illuminated Monument-style Ground Signs. The signs shall be constructed as monument-style structures not to exceed 20 feet in height and 20 feet in width, engineered to TxDOT specifications.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Lockport City School District
Door replacements.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Lockport City School District
Close: Jan 6, 2026
Door replacements.
AvailablePennsylvania Department of Conservation and Natural Resources
Area rehab - monument restoration.
Posted Date
Nov 5, 2025
Due Date
Dec 18, 2025
Release: Nov 5, 2025
Pennsylvania Department of Conservation and Natural Resources
Close: Dec 18, 2025
Area rehab - monument restoration.
AvailablePennsylvania Department of Conservation and Natural Resources
Work consists of the removal and replacement of the seawall cap, cleaning and restoration of the Perry Monument Plaza and stabilization, cleaning, and restoration of the monument. The existing seawall cap will be removed and replaced. The restoration of the plaza includes removal and replacement of deteriorate concrete sidewalk, concrete crack repair, the removal of the knee wall and moat surrounding the monument, installation of concrete bollards with chains connecting the bollards, and lighting upgrades. The stabilization and restoration of the monument includes polymer soil injections, spall repair, removal and replacement of stone, partial stone replacement, repoint mortar joints, replace brick behind stone, and apply waterproofing and anti-graffiti coating to monument.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Pennsylvania Department of Conservation and Natural Resources
Close: Dec 18, 2025
Work consists of the removal and replacement of the seawall cap, cleaning and restoration of the Perry Monument Plaza and stabilization, cleaning, and restoration of the monument. The existing seawall cap will be removed and replaced. The restoration of the plaza includes removal and replacement of deteriorate concrete sidewalk, concrete crack repair, the removal of the knee wall and moat surrounding the monument, installation of concrete bollards with chains connecting the bollards, and lighting upgrades. The stabilization and restoration of the monument includes polymer soil injections, spall repair, removal and replacement of stone, partial stone replacement, repoint mortar joints, replace brick behind stone, and apply waterproofing and anti-graffiti coating to monument.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →