Description: Solicitation SC-1188 seeks bids for sanitary sewer installation for the Oklahoma City Water Utilities Trust. The City of Oklahoma City and its related Trusts direct bidders to use the BidNet Direct procurement system, which carries this single opportunity. The public listing gives a November 18, 2026, 10:00 a.m. CST deadline, while its detailed scope and bid documents are not publicly shown.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
162 days before RFP
Utilities planned to increase the sewer-line replacement and rehabilitation programme to $20 million annually going forward.
See sourceHide source
And then our our sewer line um replacement program uh similar to the water, we are replacing that infrastructure throughout the city. Um some of our sewer infrastructure is over 100 years old. And um so prior to this year, we had planned $15 million uh in sewer improvements um for this program and we have upped that to $20 million um each year going forward.
The Utilities Department planned a new project for permanent repair of up to three 48-inch sanitary sewer lines after inspection.
See sourceHide source
The Utilities Department is making repairs to a 48" sanitary sewer line that failed and created a sink hole near the tributary by Eastern Ave on the north side of the river. During the initial site investigation, they also noticed a depression on the east side of the tributary as well. Temporary repairs should be completed by 05/15/2026. A permanent fix…
Oklahoma City Riverfront Redevelopment Authority Agenda
OCWUT staff described a plan to remove lift stations and extend a gravity sewer line from south of Lake Hefner toward Hector Parkway and Northwest Expressway.
See sourceHide source
>> Okay. The the project is to start at Portland just south of Hefner and go through the green belt south of Hefner. And apparently it's a part of a major sewage drainage uh system with with lift stations. Why don't we Why don't we get with him get with public works and then get back with him to answer his questions. >> I know what I know which project…
Oklahoma City Water Utilities Trust Meeting
Board meeting
1 day before RFP
The Oklahoma City Water Utilities Trust approved and authorized advertising plans and specifications for Project SC-1188 sanitary sewer installation along Exchange Avenue, with bids due November 18, 2026.
See sourceHide source
III. Consent Docket A. Plans and Specifications to be advertised for bids, Project SC-1188, Sanitary Sewer Installation, along Exchange Avenue from Westwood Boulevard to South Indiana Avenue. APPROVED AND AUTHORIZED. BID RECEIPT DATE NOVEMBER 18, 2026. MOVED BY VOORHEES, SECONDED BY CARTER AYES: STONECIPHER, VOORHEES, CARTER, BRYANT
The provision of sanitary sewer repair/installation labor services and related materials and equipment on an as-needed basis for the Moccasin Bend Wastewater Treatment Plant (MBWWTP) and related facilities of the Waste Resources Division, including Combined Sewer Overflow Treat- ment Facilities (CSOTF) Sanitary and Storm Water Pump Stations, and the City Landfills.
Work includes approx 210 LF of 8" SDR 26 sewer pipe; 3 EA 4' precast manholes; 215 LF of 8" class 52 ductile iron pipe water main with fittings and associated appurtenances; 5 EA 8" water valves; 1 EA fire hydrant assembly; excavation, backfill, and compaction; and restoration of streets, sidewalks, landscaping, and all other existing improvements. This project also includes, but is not limited to, sanitary sewer bypass, temporary water connections; dewatering, erosion and sediment control, traffic maintenance, and other ancillary work.