Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Baltimore City Department of Public Works issued a public notice (SC 1043R) soliciting rehabilitation and improvements to sanitary sewers at various locations within Baltimore City. The notice includes a virtual pre-bid information session and an estimated project value in the multi-million dollar range. The posting was published mid-January 2026 with a bidder response deadline in mid-February 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consist of cleaning and CCTV inspection of sanitary sewers, combined sewers and storm drains and emergency services.
Posted Date
Jan 15, 2026
Due Date
Feb 5, 2026
Release: Jan 15, 2026
Close: Feb 5, 2026
Work consist of cleaning and CCTV inspection of sanitary sewers, combined sewers and storm drains and emergency services.
AvailableWork includes approx 1,600 LF of 18", and 24" CIPP sewer pipe, and manhole rehabilitation, as well as 12" spot repairs at additional locations. Included in the project are twelve additional alternates for top hat repair, and CIPP rehabilitation of approx 4,200 LF of 10", 12", 15", and 18" sewer pipe, and manhole rehabilitation.
Posted Date
Jan 22, 2026
Due Date
Feb 10, 2026
Release: Jan 22, 2026
Close: Feb 10, 2026
Work includes approx 1,600 LF of 18", and 24" CIPP sewer pipe, and manhole rehabilitation, as well as 12" spot repairs at additional locations. Included in the project are twelve additional alternates for top hat repair, and CIPP rehabilitation of approx 4,200 LF of 10", 12", 15", and 18" sewer pipe, and manhole rehabilitation.
AvailableRFP for traffic signal improvements on US 9W, NY 119, 117, 22, and 100B in various locations.
Posted Date
Feb 5, 2026
Due Date
Feb 5, 2026
Release: Feb 5, 2026
Close: Feb 5, 2026
RFP for traffic signal improvements on US 9W, NY 119, 117, 22, and 100B in various locations.
AvailableThe proposed improvements include building a box sewer on Harrison Street to collect all-weather flows, replacing the existing box sewers on Treat Avenue, building a new box sewer on Florida Street, installing new auxiliary box sewers on 18th and 18th Streets, lining existing sewers on 18th Street, and building or modifying sewer junction structures. The Work generally consist of the following: constructing new box sewers of various sizes; install new sewer pipes, inlets, and manholes; building new concrete junction structures; modifying or expanding existing junction structures; lining existing pipes with a cured-in-place lining; and all work. includes 1,900 CY box sewer overexcavation, 1,900 CY box sewer subbase (overexcavation replacement) installation and preparation, 17 EA box sewer manholes, 16th St. junction structure sluice gate, 36" diameter VCP sewer installation, 1 EA concrete manhole for 27" to 48" diameter sewers with frame and cover, 60" diameter sewer pipe lining installation, 60" diameter sewer pipe lining installation, 150 LF 37" waterline relocation, 135 LF 12" waterline permanent installation, emergency firefighting water system (EFWS) work - temporary removal, 1,000 LF post-construction television inspection of newly constructed side sewers and culverts, 290 LF 10" diameter VCP culvert, OCS removal with dead end supports, OCS restoration.
Posted Date
Oct 24, 2025
Due Date
Feb 12, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Oct 24, 2025
Close: Feb 12, 2026
The proposed improvements include building a box sewer on Harrison Street to collect all-weather flows, replacing the existing box sewers on Treat Avenue, building a new box sewer on Florida Street, installing new auxiliary box sewers on 18th and 18th Streets, lining existing sewers on 18th Street, and building or modifying sewer junction structures. The Work generally consist of the following: constructing new box sewers of various sizes; install new sewer pipes, inlets, and manholes; building new concrete junction structures; modifying or expanding existing junction structures; lining existing pipes with a cured-in-place lining; and all work. includes 1,900 CY box sewer overexcavation, 1,900 CY box sewer subbase (overexcavation replacement) installation and preparation, 17 EA box sewer manholes, 16th St. junction structure sluice gate, 36" diameter VCP sewer installation, 1 EA concrete manhole for 27" to 48" diameter sewers with frame and cover, 60" diameter sewer pipe lining installation, 60" diameter sewer pipe lining installation, 150 LF 37" waterline relocation, 135 LF 12" waterline permanent installation, emergency firefighting water system (EFWS) work - temporary removal, 1,000 LF post-construction television inspection of newly constructed side sewers and culverts, 290 LF 10" diameter VCP culvert, OCS removal with dead end supports, OCS restoration.
Available