CountySC
Posted
Oct 8, 2026
Oct 29, 2026
Anderson County Airport Picnic Shelter RFP
Provide and install a picnic shelter with supporting concrete for the airport playground.
Description: The City of Toledo seeks bids to construct a pre-purchased open-air picnic shelter at Savage Park, including site preparation, permitting, a concrete walk and slab, shelter installation, and site restoration. Bids must be submitted electronically through the City’s PlanetBids portal with the required city paperwork, bid guaranty, insurance, and related certifications. Prevailing-wage requirements apply, and the project must be completed within 120 days.
City · OH, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalThese related opportunities are still open for bidding.
CountySC
Posted
Oct 8, 2026
Oct 29, 2026
Provide and install a picnic shelter with supporting concrete for the airport playground.
CityOK
Posted
Sep 30, 2026
Oct 21, 2026
The major work on the project shall consist of the following: 1 LS 35'x35" Pavilion Structure w/ Power & Lights; 300 SY Sod; 325 SF 4" Thick Concrete Sidewalk
CityFL
Posted
Aug 19, 2026
Oct 22, 2026
Wetland construction. Scope of work includes - 1 LS clearing and grubbing/ site preparation; 1 LS silt fence; 1 LS turbidity barriers; 745,700 CY excavation; 1,189,000 SY grading; 53,740 SF Geocell spillway system; see attached file.
CountyGA
Posted
-
Nov 2, 2026
Colquitt County is accepting sealed bids for construction of a steel shelter and two covered walkways at the County Prison in Moultrie, Georgia. The work includes a 16-by-24-foot metal shelter, two approximately 47-by-42-foot covered walkways, concrete piers, gutters and downspouts, and associated materials, permitting, shop drawings, erection, and installation. Bidders must attend a mandatory pre-bid meeting on October 20, 2026, submit shop drawings, meet experience and insurance requirements, and include a 10% contingency for owner use.
Decision makers connected to this RFP from City of Toledo.