Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 LS of temporary silt fence; 1 LS of orange safety fence; 1 EA of remove 4" and 6" clarifier #2 interior components/ assist engineer in interior condition assessment; 100 LF of install 4" SCH 40 PVC pipe, RJ, cut to fit (as required); 250 LF of install 6" SCH 40 PVC pipe, RJ, cut to fit, (as required); 20 LF of concrete repair type A (<1/8") crack repair using 1" square groove (as required); see attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of the demolition of the existing mechanical equipment for secondary clarifier numbers 1 and 2, the installation of new clarifier mechanisms and components, construction of a new flow distribution box with associated piping, and civil site improvements. See outside link.
Posted Date
Dec 18, 2025
Due Date
Feb 11, 2026
Release: Dec 18, 2025
Close: Feb 11, 2026
Project consists of the demolition of the existing mechanical equipment for secondary clarifier numbers 1 and 2, the installation of new clarifier mechanisms and components, construction of a new flow distribution box with associated piping, and civil site improvements. See outside link.
AvailableWork includes 1,600 SF of remove & replace 4" thick concrete sidewalk; 110 SF of place new 8 thick concrete sidewalk and 1 LS of traffic control. The primary objective of this project is to remove sidewalk and replace with new constructed so as to not cause tripping hazards and to maintain a safe pedestrian passageway that is able to direct stormwater away from the entryway of the business. See attached files.
Posted Date
Jan 2, 2026
Due Date
Jan 21, 2026
Release: Jan 2, 2026
Close: Jan 21, 2026
Work includes 1,600 SF of remove & replace 4" thick concrete sidewalk; 110 SF of place new 8 thick concrete sidewalk and 1 LS of traffic control. The primary objective of this project is to remove sidewalk and replace with new constructed so as to not cause tripping hazards and to maintain a safe pedestrian passageway that is able to direct stormwater away from the entryway of the business. See attached files.
AvailableProvide all labor, materials, equipment for the replace chillers 1, 2 & 3 project.
Posted Date
Nov 20, 2025
Due Date
Jan 30, 2026
Release: Nov 20, 2025
Close: Jan 30, 2026
Provide all labor, materials, equipment for the replace chillers 1, 2 & 3 project.
AvailableThe Federal Bureau of Prisons (FBOP) seeks a contractor to replace chillers 1, 2, and 3 at the Federal Detention Center (FDC) in Miami, FL, including installation of new water-cooled, modular, centrifugal chillers and replacement of ancillary HVAC components (pumps, piping, valves, controls, mechanical, electrical, and plumbing). The contract will be a firm-fixed-price construction contract, estimated between $1,000,000 and $5,000,000, and is a total small business set-aside. The solicitation materials will be distributed solely through SAM.gov (solicitation expected to be posted around 2025-12-19); bidders must be registered in SAM to access any secured documents.
Posted Date
Dec 4, 2025
Due Date
Jan 30, 2026
Release: Dec 4, 2025
Close: Jan 30, 2026
The Federal Bureau of Prisons (FBOP) seeks a contractor to replace chillers 1, 2, and 3 at the Federal Detention Center (FDC) in Miami, FL, including installation of new water-cooled, modular, centrifugal chillers and replacement of ancillary HVAC components (pumps, piping, valves, controls, mechanical, electrical, and plumbing). The contract will be a firm-fixed-price construction contract, estimated between $1,000,000 and $5,000,000, and is a total small business set-aside. The solicitation materials will be distributed solely through SAM.gov (solicitation expected to be posted around 2025-12-19); bidders must be registered in SAM to access any secured documents.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis