Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide all labor, materials, equipment for the replace chillers 1, 2 & 3 project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Federal Bureau of Prisons (FBOP) issued Solicitation 15BBNF26B00000005 for a firm-fixed-price construction contract to replace chillers 1, 2 & 3 at the Federal Detention Center (FDC) Miami, FL; work includes removal of existing chillers and installation of new chillers per the Statement of Work and drawings. The estimated project magnitude is $1,000,000 - $5,000,000 and the procurement is a total small business set-aside under NAICS 238220 (Plumbing, Heating, and Air-Conditioning Contractors). The solicitation was posted on SAM.gov (Dec 19, 2025) and proposals are due Jan 29, 2026; all solicitation materials and amendments will be distributed through SAM.gov.
Posted Date
Dec 19, 2025
Due Date
Jan 29, 2026
Release: Dec 19, 2025
Close: Jan 29, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Federal Bureau of Prisons (FBOP) issued Solicitation 15BBNF26B00000005 for a firm-fixed-price construction contract to replace chillers 1, 2 & 3 at the Federal Detention Center (FDC) Miami, FL; work includes removal of existing chillers and installation of new chillers per the Statement of Work and drawings. The estimated project magnitude is $1,000,000 - $5,000,000 and the procurement is a total small business set-aside under NAICS 238220 (Plumbing, Heating, and Air-Conditioning Contractors). The solicitation was posted on SAM.gov (Dec 19, 2025) and proposals are due Jan 29, 2026; all solicitation materials and amendments will be distributed through SAM.gov.
The Federal Bureau of Prisons (FBOP) seeks a contractor to replace chillers 1, 2, and 3 at the Federal Detention Center (FDC) in Miami, FL, including installation of new water-cooled, modular, centrifugal chillers and replacement of ancillary HVAC components (pumps, piping, valves, controls, mechanical, electrical, and plumbing). The contract will be a firm-fixed-price construction contract, estimated between $1,000,000 and $5,000,000, and is a total small business set-aside. The solicitation materials will be distributed solely through SAM.gov (solicitation expected to be posted around 2025-12-19); bidders must be registered in SAM to access any secured documents.
Posted Date
Dec 4, 2025
Due Date
Jan 30, 2026
Release: Dec 4, 2025
Close: Jan 30, 2026
The Federal Bureau of Prisons (FBOP) seeks a contractor to replace chillers 1, 2, and 3 at the Federal Detention Center (FDC) in Miami, FL, including installation of new water-cooled, modular, centrifugal chillers and replacement of ancillary HVAC components (pumps, piping, valves, controls, mechanical, electrical, and plumbing). The contract will be a firm-fixed-price construction contract, estimated between $1,000,000 and $5,000,000, and is a total small business set-aside. The solicitation materials will be distributed solely through SAM.gov (solicitation expected to be posted around 2025-12-19); bidders must be registered in SAM to access any secured documents.
AvailableThe project to replace the end of lifecycle chillers at buildings 1, 2 and 104 shall include the following: The project shall replace the standby chiller located on the roof of building 1 above the kitchen. Replace building 2 chillers 1 and 2, modifications to chilled water piping in basement to utilize campus chilled water as backup and remove chiller 3. Replace building 104 operating room backup chiller and relocate to roof of building 104, to include additional piping to relocate chiller to roof. See attached file.
Posted Date
Nov 6, 2025
Due Date
Jan 5, 2026
Release: Nov 6, 2025
Close: Jan 5, 2026
The project to replace the end of lifecycle chillers at buildings 1, 2 and 104 shall include the following: The project shall replace the standby chiller located on the roof of building 1 above the kitchen. Replace building 2 chillers 1 and 2, modifications to chilled water piping in basement to utilize campus chilled water as backup and remove chiller 3. Replace building 104 operating room backup chiller and relocate to roof of building 104, to include additional piping to relocate chiller to roof. See attached file.
The solicitation titled "[AMENDED] Z1DA--595-26-204 Replace Chillers Buildings 1, 2, and 104 DB (VA-26-00013164)" is a two‑phase design‑build RFP issued by the Veterans Integrated Service Network 04 (VISN 04) Contracting Office / Lebanon Veteran Administration Medical Center. Phase I proposals are due by 1/5/2026 at 4:00 PM Eastern Time (2026-01-05T21:00:00Z). The contract is set‑aside 100 % for Service‑Disabled Veteran‑Owned Small Businesses (SDVOSB).
Posted Date
-
Due Date
Jan 5, 2026
Close: Jan 5, 2026
The solicitation titled "[AMENDED] Z1DA--595-26-204 Replace Chillers Buildings 1, 2, and 104 DB (VA-26-00013164)" is a two‑phase design‑build RFP issued by the Veterans Integrated Service Network 04 (VISN 04) Contracting Office / Lebanon Veteran Administration Medical Center. Phase I proposals are due by 1/5/2026 at 4:00 PM Eastern Time (2026-01-05T21:00:00Z). The contract is set‑aside 100 % for Service‑Disabled Veteran‑Owned Small Businesses (SDVOSB).