Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
SCRO
Provide all labor, materials, equipment for the replace chillers 1, 2 & 3 project.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Department of Veterans Affairs
The project to replace the end of lifecycle chillers at buildings 1, 2 and 104 shall include the following: The project shall replace the standby chiller located on the roof of building 1 above the kitchen. Replace building 2 chillers 1 and 2, modifications to chilled water piping in basement to utilize campus chilled water as backup and remove chiller 3. Replace building 104 operating room backup chiller and relocate to roof of building 104, to include additional piping to relocate chiller to roof. See attached file.
Posted Date
Nov 6, 2025
Due Date
Nov 21, 2025
Release: Nov 6, 2025
Department of Veterans Affairs
Close: Nov 21, 2025
The project to replace the end of lifecycle chillers at buildings 1, 2 and 104 shall include the following: The project shall replace the standby chiller located on the roof of building 1 above the kitchen. Replace building 2 chillers 1 and 2, modifications to chilled water piping in basement to utilize campus chilled water as backup and remove chiller 3. Replace building 104 operating room backup chiller and relocate to roof of building 104, to include additional piping to relocate chiller to roof. See attached file.
242-Network Contract Office 02 (36C242)
Replace pumps for chillers.
Posted Date
Nov 3, 2025
Due Date
Dec 3, 2025
Release: Nov 3, 2025
242-Network Contract Office 02 (36C242)
Close: Dec 3, 2025
Replace pumps for chillers.
AvailableNAVFAC Mid-Atlantic
The work for this project includes the replacement of two chillers, remove or alter existing work, repair or replace portions of existing work which had been altered during construction operations.
Posted Date
Nov 10, 2025
Due Date
Dec 5, 2025
Release: Nov 10, 2025
NAVFAC Mid-Atlantic
Close: Dec 5, 2025
The work for this project includes the replacement of two chillers, remove or alter existing work, repair or replace portions of existing work which had been altered during construction operations.
AvailableForsyth County School District
Purchase, delivery, and installation of two (2) Blast Chillers at two (2) different FCS school kitchens.
Posted Date
Nov 10, 2025
Due Date
Nov 24, 2025
Release: Nov 10, 2025
Forsyth County School District
Close: Nov 24, 2025
Purchase, delivery, and installation of two (2) Blast Chillers at two (2) different FCS school kitchens.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis