Department of Veterans Affairs
The project to replace the end of lifecycle chillers at buildings 1, 2 and 104 shall include the following: The project shall replace the standby chiller located on the roof of building 1 above the kitchen. Replace building 2 chillers 1 and 2, modifications to chilled water piping in basement to utilize campus chilled water as backup and remove chiller 3. Replace building 104 operating room backup chiller and relocate to roof of building 104, to include additional piping to relocate chiller to roof. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
SCRO
Provide all labor, materials, equipment for the replace chillers 1, 2 & 3 project.
Posted Date
Nov 20, 2025
Due Date
Nov 26, 2025
Release: Nov 20, 2025
SCRO
Close: Nov 26, 2025
Provide all labor, materials, equipment for the replace chillers 1, 2 & 3 project.
AvailableDepartment of Veterans Affairs
The prime contractor is to contract/partner with an Architect Engineering firm to provide design-build services necessary for completion of designs and the construction of the Replace Door Frames Building 104 project.
Posted Date
Oct 17, 2025
Due Date
Nov 26, 2025
Release: Oct 17, 2025
Department of Veterans Affairs
Close: Nov 26, 2025
The prime contractor is to contract/partner with an Architect Engineering firm to provide design-build services necessary for completion of designs and the construction of the Replace Door Frames Building 104 project.
Available260-Network Contract Office 20 (36C260)
Replace HVAC B23-B45.The puropse of this project is to replace the fan coil units and fin tube radiators throughout buildings 23 and 45 at BVAMC. Heat exchangers, pumps, and valves will be installed to create a closed heating loop in in the buildings. The raw geothermal water that currently runs throughout the buildings will be used to heat the closed heating loop which will reduce the wear that occurs in the piping and equipment by the raw geothermal water. New piping will be installed where needed. Old piping removed. All necessary connections, valves, structure modifications, and accessories shall be included. See attached file.
Posted Date
Nov 7, 2025
Due Date
Dec 8, 2025
Release: Nov 7, 2025
260-Network Contract Office 20 (36C260)
Close: Dec 8, 2025
Replace HVAC B23-B45.The puropse of this project is to replace the fan coil units and fin tube radiators throughout buildings 23 and 45 at BVAMC. Heat exchangers, pumps, and valves will be installed to create a closed heating loop in in the buildings. The raw geothermal water that currently runs throughout the buildings will be used to heat the closed heating loop which will reduce the wear that occurs in the piping and equipment by the raw geothermal water. New piping will be installed where needed. Old piping removed. All necessary connections, valves, structure modifications, and accessories shall be included. See attached file.
261P - NETWORK CONTRACT OFC21 (00261P)
DESIGN BUILD: The scope of this project shall provide complete design services for permanent window-washing davit anchor systems, including evaluation of existing roof and parapet structures, engineering calculations, and preparation of construction documents compliant with OSHA, OHS, and VA Master Specifications for Install Tieback Roof Anchors Building 1.
Posted Date
Oct 23, 2025
Due Date
Dec 3, 2025
Release: Oct 23, 2025
261P - NETWORK CONTRACT OFC21 (00261P)
Close: Dec 3, 2025
DESIGN BUILD: The scope of this project shall provide complete design services for permanent window-washing davit anchor systems, including evaluation of existing roof and parapet structures, engineering calculations, and preparation of construction documents compliant with OSHA, OHS, and VA Master Specifications for Install Tieback Roof Anchors Building 1.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis