Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1,600 SF of remove & replace 4" thick concrete sidewalk; 110 SF of place new 8 thick concrete sidewalk and 1 LS of traffic control. The primary objective of this project is to remove sidewalk and replace with new constructed so as to not cause tripping hazards and to maintain a safe pedestrian passageway that is able to direct stormwater away from the entryway of the business. See attached files.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Furnish all labor, materials, equipment, tools, incidentals, and transportation to demolish and dispose existing curb ramps; construct curb ramps, spandrels, sidewalk, and curb and gutter. 18 ea remove and replace curb ramps; 100 sf remove and replace spandrels; 171 sf remove and replace 4" thick sidewalk; 10 lf remove and replace 6" thick curb and gutter.
Posted Date
Nov 13, 2025
Due Date
Jan 15, 2026
Release: Nov 13, 2025
Close: Jan 15, 2026
Furnish all labor, materials, equipment, tools, incidentals, and transportation to demolish and dispose existing curb ramps; construct curb ramps, spandrels, sidewalk, and curb and gutter. 18 ea remove and replace curb ramps; 100 sf remove and replace spandrels; 171 sf remove and replace 4" thick sidewalk; 10 lf remove and replace 6" thick curb and gutter.
AvailableProvide beveling services to remove sidewalk trip hazards. These services shall not include concrete grinding or pulverizing.
Posted Date
Dec 15, 2025
Due Date
Jan 9, 2026
Release: Dec 15, 2025
Close: Jan 9, 2026
Provide beveling services to remove sidewalk trip hazards. These services shall not include concrete grinding or pulverizing.
Work includes 7 EA temporary drainage inlet protection; 14,421 SF remove sidewalk; 554 LF remove curb; 205 LF remove curb and gutter; 3,704 SF remove driveway; 2,954 SF remove asphalt; 314 CY excavation; 16,496 SF 4 inch sidewalk and driveway; 607 LF concrete curb; 263 LF concrete curb and gutter; 495 SF 6 inch driveway and sidewalk; 90 SF 4" patterned / decorative / brick sidewalk & driveway; 13 EA curb ramp (ada compliant). See attached file.
Posted Date
Dec 12, 2025
Due Date
Jan 14, 2026
Release: Dec 12, 2025
Close: Jan 14, 2026
Work includes 7 EA temporary drainage inlet protection; 14,421 SF remove sidewalk; 554 LF remove curb; 205 LF remove curb and gutter; 3,704 SF remove driveway; 2,954 SF remove asphalt; 314 CY excavation; 16,496 SF 4 inch sidewalk and driveway; 607 LF concrete curb; 263 LF concrete curb and gutter; 495 SF 6 inch driveway and sidewalk; 90 SF 4" patterned / decorative / brick sidewalk & driveway; 13 EA curb ramp (ada compliant). See attached file.
Provide sidewalk repairs. The sidewalk repair sections will be twenty feet or less in length. Each sidewalk repair area is marked with white paint. The scope of work for the sidewalk repairs shall be to saw cut the area, remove existing sidewalk, set forms, rebar, dowels, expansion joints as needed, place and finish new concrete sidewalk. Rebar shall be #3 bars on 16" centers, both ways. Concrete shall be a minimum of 5 sack cement per yard, limestone gravel, 3,000 psi ready mix concrete. Expansion joints shall be redwood or treated wood for ground contact.
Posted Date
Dec 11, 2025
Due Date
Jan 14, 2026
Release: Dec 11, 2025
Close: Jan 14, 2026
Provide sidewalk repairs. The sidewalk repair sections will be twenty feet or less in length. Each sidewalk repair area is marked with white paint. The scope of work for the sidewalk repairs shall be to saw cut the area, remove existing sidewalk, set forms, rebar, dowels, expansion joints as needed, place and finish new concrete sidewalk. Rebar shall be #3 bars on 16" centers, both ways. Concrete shall be a minimum of 5 sack cement per yard, limestone gravel, 3,000 psi ready mix concrete. Expansion joints shall be redwood or treated wood for ground contact.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis