Closing soon

Santa Fe College Building M Renovation Print Shop Relocation - Phase 1 RFP

Description: The project consists of the interior renovation of existing classrooms m-170 and m-170a, along with an addition to the existing building to accommodate the new classroom m-170b. Trade packages include but are not limited to; demolition and concrete cutting; concrete; masonry; steel; casework; thermal / roofing / insulation; doors, windows and storefront; metal framing and gwb; sealed concrete flooring / base; acoustical ceiling; painting; roller shades; plumbing; mechanical; electrical; communications; sitework.

Buyer
Santa Fe College

HigherEducation · FL, US

Released
Oct 22, 2026
Closes
Nov 10, 2026(14 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts