Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Project includes the following Work: The replacement of sanitary sewer trunk main to the Village of West Milton WWTP.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
Posted Date
Jan 13, 2026
Due Date
Jan 30, 2026
Release: Jan 13, 2026
Close: Jan 30, 2026
The project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
872 LF sewer line replacement, 6 manholes, 13 service connections, & 520 LF surface repair.
Posted Date
Jan 17, 2026
Due Date
Feb 10, 2026
Release: Jan 17, 2026
Close: Feb 10, 2026
872 LF sewer line replacement, 6 manholes, 13 service connections, & 520 LF surface repair.
AvailableConstruction of sewage treatment plant improvements and sanitary sewer replacement.
Posted Date
Dec 11, 2025
Due Date
Jan 29, 2026
Release: Dec 11, 2025
Close: Jan 29, 2026
Construction of sewage treatment plant improvements and sanitary sewer replacement.
AvailableWork includes 1 LS of mobilization; 1,002 LF of plug and abandon existing 7" dia hdpe; 105 LF of emovre existing 7" dia hdpe; 1 EA of abandon existing sanitary sewer manhole; 2 EA of remove existing standard sanitary sewer manhole; 1 LS of landscape clearing; 622 LF of install new 8" dia hdpe, solid wall pipe, sdr 9.0, above ground, including ac dike; 452 LF of install new 8" dia hdpe, solid wall pipe, sdr 9.0, underground; 2 EA of construct new standard sanitary sewer manhole; 3 EA of install new drop connection in existing sanitary sewer manhole to remain; etc, see outside link.
Posted Date
Dec 17, 2025
Due Date
Jan 29, 2026
Release: Dec 17, 2025
Close: Jan 29, 2026
Work includes 1 LS of mobilization; 1,002 LF of plug and abandon existing 7" dia hdpe; 105 LF of emovre existing 7" dia hdpe; 1 EA of abandon existing sanitary sewer manhole; 2 EA of remove existing standard sanitary sewer manhole; 1 LS of landscape clearing; 622 LF of install new 8" dia hdpe, solid wall pipe, sdr 9.0, above ground, including ac dike; 452 LF of install new 8" dia hdpe, solid wall pipe, sdr 9.0, underground; 2 EA of construct new standard sanitary sewer manhole; 3 EA of install new drop connection in existing sanitary sewer manhole to remain; etc, see outside link.