Yellow Bluff Sanitary Sewer Improvements Phase 4 RFP
Purchase and delivery of 32 1,000 gallon septic tanks, 20 pumps, 20 panels, 1,800 LF of field lines.
Description: Work consist of 20,010 lf silt fence, 5 ea of temporary stream crossing, 500 tn of rip rap, 226,150 sf of clearing and grubbing, 226,150 sf of grassing - permanent, tree protection fence (tr) orange barrier fence/tree save, landscaping, core new or existing manhole for 8" or 12" line, 29 ea of pvc vent pipe schedule 40, 4", sanitary sewer manhole marker, 25 ea of manhole cover, bolt down, 19 lf of 0' - 8' cut pvc, 1 ea of 8" sewer service, 5 ea of 12" sewer service (connect to pipe or manhole), 20 ea of bypass pump, open cut asphalt & replacement 8" concrete & 2" asphalt). See attached file.
City · GA, US
Original attachments and procurement documents tied to this bid.
These related opportunities are still open for bidding.
CityAL
Posted
Sep 1, 2026
Oct 6, 2026
Purchase and delivery of 32 1,000 gallon septic tanks, 20 pumps, 20 panels, 1,800 LF of field lines.
CityAZ
Posted
Aug 28, 2026
Oct 15, 2026
Work includes 40 EA tree removal > 12" diameter, 36980 SY subgrade preparation, 8" thick, 49510 SY asphalt chip seal, low volume w/ pmm, 147 SY asphalt concrete (ac) pavement, 3" thick, 13479 SY asphalt concrete (ac) pavement, 4" thick, 10690 LF temporary pavement striping, white (4" equivalent), 800 LF concrete curb & gutter, qcsd 220q-2, type c, 2164 SF concrete 5' sidewalk, qcsd 230q, 73 SF sidewalk termination ramp, 3695 SF 6' valley gutter & spandrels, qcsd 240q, 1552 SF concrete in roadway, 58 LF remove 6" pvc water main. See attached file.
CountyOH
Posted
Sep 14, 2026
Oct 8, 2026
work includes approx 1 LS clearing and grubbing; 10,600 LF 8" PVC SDR35 sanitary sewer; 1 LS sediment and erosion control; 900 LF 6" HDPE DR21 sanitary lateral by directional bore; 320 LF 18" storm sewer replacement; 39,500 SY 1" asphalt roadway overlay.
CityOR
Posted
Aug 28, 2026
Sep 29, 2026
The City of Bend seeks proposals to address sewer system deficiencies in southwest Bend. The project generally includes extending gravity sewer mainline, decommissioning existing pump stations along the alignment, and installing service laterals for properties currently served by onsite septic systems. The project may also include transportation improvements, with detailed services described in Exhibit A – Statement of Work.