Retrieving RFP details
Release
Close
Rolling Creek Utility District
Sanitary Sewer Rehabilitation.
1_1657-0031_Invitation to bidders
Rolling Creek Utility District
Work includes : sanitary sewer rehabilitation phase 1.
Newport Mud
Provide sanitary sewer phase 8 manhole rehabilitation. In general, this work consists of: cleaning and preparing of sanitary sewer manholes prior to rehabilitation, including removing existing liners, debris, etc; repair of sanitary sewer manholes including cementitious lining, epoxy lining, removing and replacing frames and covers, raising sanitary sewer manholes, repair of bench and invert, and grouting exterior of manhole frames; bypass pumping, as directed by engineer, to properly rehabilitate any manholes where a flow through bridge or plug is not a viable option. The cost for flow through bridges or plugs shall be included in other work items. See outside link.
City of Windsor
Project includes sanitary sewer and manhole rehabilitation, involves sewer lining by curing in place pipe (cipp) lining and manhole rehabilitation. The bid for the cipp trunk sewer lining and manhole rehabilitation encompasses but not limited to approx. 6,200 LF of 8" sanitary sewers and 290 VF of manhole rehabilitation, mobilization, demobilization, cleaning, televising, bypass pumping, traffic control, point repairs, surface restoration, and incidentals.
Release
Oct 14, 2025
Close
Oct 30, 2025