Summary
Area 1 – Electrical Conduit and Power Installation: Install approximately 350 linear feet of 2" Schedule 40 PVC conduit with associated wiring, including all excavation and backfilling; Furnish and install (3) #12 AWG copper THWN-2 conductors to provide 120-volt power to the ADS ECHO monitoring unit, including hot, neutral, and equipment grounding conductor. Furnish and install utility-approved meter base and outdoor-rated breaker/ disconnect enclosure to provide 120-volt power to ADS ECHO monitoring unit. Coordinate with Met-Ed to determine whether mounting to an existing utility pole is permitted. If a separate support post is required, furnish and install a galvanized steel post set in concrete footing, including mounting hardware and required disconnects and receptacles as needed for ADS equipment; Provide electric power service and distribution, including coordination with Met-Ed; Core-drill manhole and extend conduit into manhole interior, including sealing in accordance with the Contract Documents.Area 2 – Manhole Modifications and Electrical Installation: Install approx. 70 LF of 2" Schedule 40 PVC conduit with associated wiring, including all excavation and backfilling; Furnish and install (3) #12 AWG copper THWN-2 conductors to provide 120-volt power to the ADS ECHO monitoring unit, including hot, neutral, and equipment grounding conductor. Furnish and install utility-approved meter base and outdoor-rated breaker/ disconnect enclosure to provide 120-volt power to ADS ECHO monitoring unit. Coordinate with Met-Ed to determine whether mounting to an existing utility pole is permitted. If a separate support post is required, furnish and install a galvanized steel post set in concrete footing, including mounting hardware and required disconnects and receptacles as needed for ADS equipment; Provide electric power service and distribution, including coordination with Met-Ed; Core-drill manhole and extend conduit into manhole interior, including sealing in accordance with the Contract Documents. Remove existing frame and cover; furnish and install one (1) 18" precast concrete riser section and new frame and cover to adjust manhole to proposed finished grade, complete in place. Area 3 – Sanitary Sewer Manhole Installation: The installation of one (1) five-foot-diameter sanitary sewer manhole complete with frame and cover to an approximate depth of eleven feet; Including excavation, bedding, structure installation, cut-in / tie-in to existing sanitary sewer, backfill, compaction, surface restoration, and required testing in accordance with the Contract Documents.