Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Township of North Cornwall
North Cornwall Township will auction a 2013 Ford F-350 Super Duty with snowplow and salt spreader pursuant to Resolution 2026-11. The auction will be hosted on the Municibid online government auction platform, beginning April 6, 2026 at 8:00 a.m. and concluding May 8, 2026 at 2:00 p.m. The vehicle is offered as‑is; inspections are available at the Township Administration Building in Lebanon, PA during listed hours.
Posted Date
Apr 6, 2026
Due Date
May 8, 2026
Release: Apr 6, 2026
Township of North Cornwall
Close: May 8, 2026
North Cornwall Township will auction a 2013 Ford F-350 Super Duty with snowplow and salt spreader pursuant to Resolution 2026-11. The auction will be hosted on the Municibid online government auction platform, beginning April 6, 2026 at 8:00 a.m. and concluding May 8, 2026 at 2:00 p.m. The vehicle is offered as‑is; inspections are available at the Township Administration Building in Lebanon, PA during listed hours.
AvailableTownship of North Cornwall
Area 1 – Electrical Conduit and Power Installation: Install approximately 350 linear feet of 2" Schedule 40 PVC conduit with associated wiring, including all excavation and backfilling; Furnish and install (3) #12 AWG copper THWN-2 conductors to provide 120-volt power to the ADS ECHO monitoring unit, including hot, neutral, and equipment grounding conductor. Furnish and install utility-approved meter base and outdoor-rated breaker/ disconnect enclosure to provide 120-volt power to ADS ECHO monitoring unit. Coordinate with Met-Ed to determine whether mounting to an existing utility pole is permitted. If a separate support post is required, furnish and install a galvanized steel post set in concrete footing, including mounting hardware and required disconnects and receptacles as needed for ADS equipment; Provide electric power service and distribution, including coordination with Met-Ed; Core-drill manhole and extend conduit into manhole interior, including sealing in accordance with the Contract Documents.Area 2 – Manhole Modifications and Electrical Installation: Install approx. 70 LF of 2" Schedule 40 PVC conduit with associated wiring, including all excavation and backfilling; Furnish and install (3) #12 AWG copper THWN-2 conductors to provide 120-volt power to the ADS ECHO monitoring unit, including hot, neutral, and equipment grounding conductor. Furnish and install utility-approved meter base and outdoor-rated breaker/ disconnect enclosure to provide 120-volt power to ADS ECHO monitoring unit. Coordinate with Met-Ed to determine whether mounting to an existing utility pole is permitted. If a separate support post is required, furnish and install a galvanized steel post set in concrete footing, including mounting hardware and required disconnects and receptacles as needed for ADS equipment; Provide electric power service and distribution, including coordination with Met-Ed; Core-drill manhole and extend conduit into manhole interior, including sealing in accordance with the Contract Documents. Remove existing frame and cover; furnish and install one (1) 18" precast concrete riser section and new frame and cover to adjust manhole to proposed finished grade, complete in place. Area 3 – Sanitary Sewer Manhole Installation: The installation of one (1) five-foot-diameter sanitary sewer manhole complete with frame and cover to an approximate depth of eleven feet; Including excavation, bedding, structure installation, cut-in / tie-in to existing sanitary sewer, backfill, compaction, surface restoration, and required testing in accordance with the Contract Documents.
Posted Date
Mar 9, 2026
Due Date
Apr 3, 2026
Release: Mar 9, 2026
Township of North Cornwall
Close: Apr 3, 2026
Area 1 – Electrical Conduit and Power Installation: Install approximately 350 linear feet of 2" Schedule 40 PVC conduit with associated wiring, including all excavation and backfilling; Furnish and install (3) #12 AWG copper THWN-2 conductors to provide 120-volt power to the ADS ECHO monitoring unit, including hot, neutral, and equipment grounding conductor. Furnish and install utility-approved meter base and outdoor-rated breaker/ disconnect enclosure to provide 120-volt power to ADS ECHO monitoring unit. Coordinate with Met-Ed to determine whether mounting to an existing utility pole is permitted. If a separate support post is required, furnish and install a galvanized steel post set in concrete footing, including mounting hardware and required disconnects and receptacles as needed for ADS equipment; Provide electric power service and distribution, including coordination with Met-Ed; Core-drill manhole and extend conduit into manhole interior, including sealing in accordance with the Contract Documents.Area 2 – Manhole Modifications and Electrical Installation: Install approx. 70 LF of 2" Schedule 40 PVC conduit with associated wiring, including all excavation and backfilling; Furnish and install (3) #12 AWG copper THWN-2 conductors to provide 120-volt power to the ADS ECHO monitoring unit, including hot, neutral, and equipment grounding conductor. Furnish and install utility-approved meter base and outdoor-rated breaker/ disconnect enclosure to provide 120-volt power to ADS ECHO monitoring unit. Coordinate with Met-Ed to determine whether mounting to an existing utility pole is permitted. If a separate support post is required, furnish and install a galvanized steel post set in concrete footing, including mounting hardware and required disconnects and receptacles as needed for ADS equipment; Provide electric power service and distribution, including coordination with Met-Ed; Core-drill manhole and extend conduit into manhole interior, including sealing in accordance with the Contract Documents. Remove existing frame and cover; furnish and install one (1) 18" precast concrete riser section and new frame and cover to adjust manhole to proposed finished grade, complete in place. Area 3 – Sanitary Sewer Manhole Installation: The installation of one (1) five-foot-diameter sanitary sewer manhole complete with frame and cover to an approximate depth of eleven feet; Including excavation, bedding, structure installation, cut-in / tie-in to existing sanitary sewer, backfill, compaction, surface restoration, and required testing in accordance with the Contract Documents.
Township of North Cornwall
Provide highway traffic line painting.
Posted Date
May 23, 2025
Due Date
Jun 16, 2025
Release: May 23, 2025
Township of North Cornwall
Close: Jun 16, 2025
Provide highway traffic line painting.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Not a viable path here—pivot to the formal bid process.
Coops: For future consideration only—if the buyer is open to alternatives, mention COSTARS, CapCOG Joint Bids, PA eMarketplace, and Sourcewell. “Buyer hasn’t historically used coops/resellers, but you can encourage them to explore these procurement programs and these resellers as future options.”
Township of North Cornwall: No documented sole-source policy or contracts identified. Deprioritize this path and plan for a formal competitive bid.
Board meetings and strategic plans from Township of North Cornwall
The board addressed planning issues, specifically granting a waiver for development identification signs for the Meadow Lane Farms project with maintenance conditions. In public works, the board approved a quote for the 2026 Flow Metering Project and authorized the advertisement for related conduit installation work. Administration business included the approval of the treasurer's report and bill payments. The board also discussed joining a consortium for the negotiation of the upcoming Comcast Cable Franchise Agreement renewal and received an update on the status of the Verizon Agreement.
The board conducted a re-organization, appointing a new Chairman, Vice-Chairman, and Secretary/Treasurer. The Treasurer's Report was reviewed. Discussions focused on planning for the upcoming Community Day event, including potential baseball game activities, coordinating with local food vendors, and creating promotional materials. Additionally, the board discussed potential physical modifications to the upper baseball field to better accommodate 12U baseball teams.
Key discussions during the meeting included a public comment regarding snow clearing at Gloninger Woods Park. In Public Safety, reports were provided for the Neversink Volunteer Fire Company and the Police Department activities for January, noting metrics like Calls to Service and Accidents. Training attendance and community outreach programs were also mentioned. Under Zoning/Code/Planning Commission, the schedule for the next Planning Commission meeting was noted. Engineering discussions centered on receiving feedback on a proposal to install lighting along a portion of the Lebanon Valley Rail Trail near the 22nd Street Bridge due to safety concerns. Public Works actions included approving the advertisement for the 2026 Paving Project, approving Resolution 2026-10 regarding an escalator clause for bituminous materials, and awarding a quote for the Creekside Drive guiderail replacement. Payments and a change order were approved for the Dairy Road Pump Station Project. Finally, the appointment of Tracy Christman to the Board of Auditors was approved as new business.
The meeting addressed several key items, primarily concerning land development plans and agreements. The Board approved the Letter of Credit, Improvements and Financial Security Agreement, Stormwater O & M Agreement, and the Preliminary Final Land Development Plan, including several ordinance waivers, for the Nolt's Garden Center expansion project. For the HTK Property, Inc., development, approvals were granted for a restricted escrow account, Improvements and Financial Security Agreement, Stormwater O & M Agreement, Sidewalk Deferment Agreement, and the Preliminary Final Land Development Plan, including specific waivers. Other actions included the approval of the Treasurer's report and payment of bills, appointment of a representative to the Lebanon Community Library Board, approval of Line of Credit Reductions for North Cornwall Commons Lots 19 and 26, formal approval of the Snow Emergency Declaration from January 25-27, and the approval of a resolution accepting a section of the 22nd Street Right of Way. A formal agreement was also adopted regarding planting restrictions near the intersection of Forney Road and Meadow Lane to improve sight lines.
The meeting addressed several planning and zoning matters. Key discussions included the review of the Lot Add On & Preliminary/Final Land Development Plan for Nolt's Garden Center-2025 Greenhouses, including a recommendation to accept a blanket easement for stormwater improvements instead of individual ones, and contingent approval based on engineering review letter requirements. The commission also reviewed the revised Zoning Ordinance No. #338 and subsequently recommended its approval. Additionally, the North Cornwall Commons development was reviewed.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Township of North Cornwall's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Chief of Police, Lebanon County Regional Police Department
Premium
Access the largest public sector contact database