Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Township of North Cornwall
North Cornwall Township is soliciting bids for the Sanitary Sewer Manhole Installation & Modification Project (Project No. 18-400-500) to improve the township’s sanitary sewer infrastructure. The scope includes manhole modification (remove existing frame and cover; furnish and install an 18-inch precast concrete riser section and new frame and cover) and installation of a five-foot-diameter sanitary sewer manhole including excavation, bedding, tie-in to the existing sewer, backfill, compaction, surface restoration, and required testing. Bidders must provide bid security (10% or certified check), comply with Pennsylvania Prevailing Wage Act, submit a non-collusion affidavit, and use E-Verify; the solicitation was posted 2026-04-23 and bids are due 2026-05-27.
Posted Date
Apr 23, 2026
Due Date
May 27, 2026
Release: Apr 23, 2026
Township of North Cornwall
Close: May 27, 2026
North Cornwall Township is soliciting bids for the Sanitary Sewer Manhole Installation & Modification Project (Project No. 18-400-500) to improve the township’s sanitary sewer infrastructure. The scope includes manhole modification (remove existing frame and cover; furnish and install an 18-inch precast concrete riser section and new frame and cover) and installation of a five-foot-diameter sanitary sewer manhole including excavation, bedding, tie-in to the existing sewer, backfill, compaction, surface restoration, and required testing. Bidders must provide bid security (10% or certified check), comply with Pennsylvania Prevailing Wage Act, submit a non-collusion affidavit, and use E-Verify; the solicitation was posted 2026-04-23 and bids are due 2026-05-27.
Township of North Cornwall
North Cornwall Township will auction a 2013 Ford F-350 Super Duty with snowplow and salt spreader pursuant to Resolution 2026-11. The auction will be hosted on the Municibid online government auction platform, beginning April 6, 2026 at 8:00 a.m. and concluding May 8, 2026 at 2:00 p.m. The vehicle is offered as‑is; inspections are available at the Township Administration Building in Lebanon, PA during listed hours.
Posted Date
Apr 6, 2026
Due Date
May 8, 2026
Release: Apr 6, 2026
Township of North Cornwall
Close: May 8, 2026
North Cornwall Township will auction a 2013 Ford F-350 Super Duty with snowplow and salt spreader pursuant to Resolution 2026-11. The auction will be hosted on the Municibid online government auction platform, beginning April 6, 2026 at 8:00 a.m. and concluding May 8, 2026 at 2:00 p.m. The vehicle is offered as‑is; inspections are available at the Township Administration Building in Lebanon, PA during listed hours.
Township of North Cornwall
Area 1 – Electrical Conduit and Power Installation: Install approximately 350 linear feet of 2" Schedule 40 PVC conduit with associated wiring, including all excavation and backfilling; Furnish and install (3) #12 AWG copper THWN-2 conductors to provide 120-volt power to the ADS ECHO monitoring unit, including hot, neutral, and equipment grounding conductor. Furnish and install utility-approved meter base and outdoor-rated breaker/ disconnect enclosure to provide 120-volt power to ADS ECHO monitoring unit. Coordinate with Met-Ed to determine whether mounting to an existing utility pole is permitted. If a separate support post is required, furnish and install a galvanized steel post set in concrete footing, including mounting hardware and required disconnects and receptacles as needed for ADS equipment; Provide electric power service and distribution, including coordination with Met-Ed; Core-drill manhole and extend conduit into manhole interior, including sealing in accordance with the Contract Documents.Area 2 – Manhole Modifications and Electrical Installation: Install approx. 70 LF of 2" Schedule 40 PVC conduit with associated wiring, including all excavation and backfilling; Furnish and install (3) #12 AWG copper THWN-2 conductors to provide 120-volt power to the ADS ECHO monitoring unit, including hot, neutral, and equipment grounding conductor. Furnish and install utility-approved meter base and outdoor-rated breaker/ disconnect enclosure to provide 120-volt power to ADS ECHO monitoring unit. Coordinate with Met-Ed to determine whether mounting to an existing utility pole is permitted. If a separate support post is required, furnish and install a galvanized steel post set in concrete footing, including mounting hardware and required disconnects and receptacles as needed for ADS equipment; Provide electric power service and distribution, including coordination with Met-Ed; Core-drill manhole and extend conduit into manhole interior, including sealing in accordance with the Contract Documents. Remove existing frame and cover; furnish and install one (1) 18" precast concrete riser section and new frame and cover to adjust manhole to proposed finished grade, complete in place. Area 3 – Sanitary Sewer Manhole Installation: The installation of one (1) five-foot-diameter sanitary sewer manhole complete with frame and cover to an approximate depth of eleven feet; Including excavation, bedding, structure installation, cut-in / tie-in to existing sanitary sewer, backfill, compaction, surface restoration, and required testing in accordance with the Contract Documents.
Posted Date
Mar 9, 2026
Due Date
May 27, 2026
Release: Mar 9, 2026
Township of North Cornwall
Close: May 27, 2026
Area 1 – Electrical Conduit and Power Installation: Install approximately 350 linear feet of 2" Schedule 40 PVC conduit with associated wiring, including all excavation and backfilling; Furnish and install (3) #12 AWG copper THWN-2 conductors to provide 120-volt power to the ADS ECHO monitoring unit, including hot, neutral, and equipment grounding conductor. Furnish and install utility-approved meter base and outdoor-rated breaker/ disconnect enclosure to provide 120-volt power to ADS ECHO monitoring unit. Coordinate with Met-Ed to determine whether mounting to an existing utility pole is permitted. If a separate support post is required, furnish and install a galvanized steel post set in concrete footing, including mounting hardware and required disconnects and receptacles as needed for ADS equipment; Provide electric power service and distribution, including coordination with Met-Ed; Core-drill manhole and extend conduit into manhole interior, including sealing in accordance with the Contract Documents.Area 2 – Manhole Modifications and Electrical Installation: Install approx. 70 LF of 2" Schedule 40 PVC conduit with associated wiring, including all excavation and backfilling; Furnish and install (3) #12 AWG copper THWN-2 conductors to provide 120-volt power to the ADS ECHO monitoring unit, including hot, neutral, and equipment grounding conductor. Furnish and install utility-approved meter base and outdoor-rated breaker/ disconnect enclosure to provide 120-volt power to ADS ECHO monitoring unit. Coordinate with Met-Ed to determine whether mounting to an existing utility pole is permitted. If a separate support post is required, furnish and install a galvanized steel post set in concrete footing, including mounting hardware and required disconnects and receptacles as needed for ADS equipment; Provide electric power service and distribution, including coordination with Met-Ed; Core-drill manhole and extend conduit into manhole interior, including sealing in accordance with the Contract Documents. Remove existing frame and cover; furnish and install one (1) 18" precast concrete riser section and new frame and cover to adjust manhole to proposed finished grade, complete in place. Area 3 – Sanitary Sewer Manhole Installation: The installation of one (1) five-foot-diameter sanitary sewer manhole complete with frame and cover to an approximate depth of eleven feet; Including excavation, bedding, structure installation, cut-in / tie-in to existing sanitary sewer, backfill, compaction, surface restoration, and required testing in accordance with the Contract Documents.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Not a viable path here—pivot to the formal bid process.
Coops: For future consideration only—if the buyer is open to alternatives, mention COSTARS, CapCOG Joint Bids, PA eMarketplace, and Sourcewell. “Buyer hasn’t historically used coops/resellers, but you can encourage them to explore these procurement programs and these resellers as future options.”
Township of North Cornwall: No documented sole-source policy or contracts identified. Deprioritize this path and plan for a formal competitive bid.
Board meetings and strategic plans from Township of North Cornwall
The commission reviewed and recommended approval for the Meadow Lane Farms Phase 2 Land Development Plan, conditioned on specific review requirements. Additionally, the commission recommended approval of the Pinebrooke Subdivision development plan, subject to an access and maintenance agreement for designated lots. An update was also provided regarding current plans for the North Cornwall Commons development.
The board reviewed the Treasurer's Report and held discussions regarding the 2026 Community Day event. Planning updates included the scheduling of the event, coordination with local fire companies for fundraising, food truck arrangements, and the selection of entertainment activities such as a bounce house and dunk tank. Additionally, board members discussed promotional strategies, including the distribution of event flyers via local news publications, the township newsletter, and baseball leagues.
The meeting included the reorganization of the Commission with the nomination of a Chairman, Vice Chairman, and Secretary. Key agenda items involved the review of the Lebanon Valley Expo Center Land Development Plan and the Heritage Run Land Development Plan.
The Planning Commission reviewed the Land Development Plan for the Lebanon Valley Expo Center. Key actions included recommending approval for four specific waivers regarding curbing, basin slopes, and plan scale modifications. Additionally, the commission recommended a deferral for sidewalk installation requirements and granted a recommendation for the approval of the land development plan, subject to conditions outlined in a review letter.
The meeting included a public hearing regarding the adoption of Ordinance #339 to establish a cable franchise agreement with Verizon. Other key discussion topics included the approval of the revised land development plan for the Pinebrooke Development, an update on the DRPS Construction Project pump station, and the granting of a 60-day time extension for the Lebanon Expo Center Land Development Plan. Additionally, the board approved the release of financial security for the North Cornwall Commons Lot 19 project, appointed a new member to the Auditor's Board, and reviewed progress on the Walden Road Bridge project regarding DEP permit requirements.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Township of North Cornwall's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Chief of Police, Lebanon County Regional Police Department
Premium
Access the largest public sector contact database
© 2026 Starbridge