Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
University Of Arkansas
Work includes replacement of all plumbing, electrical and mechanical equipment housed in the lift station.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Germantown Purchasing Division
Provide design and easement acquisition consulting services for the proposed sanitary sewer lift station generator installation; easement survey layout, and negotiated acquisition; coordination with memphis light, gas, and water (mlgw) as required; determine appropriately sized generator for power requirements and location; establishment of criteria and requirements for the automatic transfer switch and power supply interruption communication links to notify the generator of circuit failures and supply power to the affected lift station; provide 100% design, specifications and bid sheet and support city staff through the pre-bid, bid, bid evaluations, and board of mayor and aldermen (bma) approval; provide construction contract administration (c/a) during construction and on-site inspection after construction bid award.
Posted Date
Oct 24, 2025
Due Date
Nov 20, 2025
Release: Oct 24, 2025
Germantown Purchasing Division
Close: Nov 20, 2025
Provide design and easement acquisition consulting services for the proposed sanitary sewer lift station generator installation; easement survey layout, and negotiated acquisition; coordination with memphis light, gas, and water (mlgw) as required; determine appropriately sized generator for power requirements and location; establishment of criteria and requirements for the automatic transfer switch and power supply interruption communication links to notify the generator of circuit failures and supply power to the affected lift station; provide 100% design, specifications and bid sheet and support city staff through the pre-bid, bid, bid evaluations, and board of mayor and aldermen (bma) approval; provide construction contract administration (c/a) during construction and on-site inspection after construction bid award.
AvailableCity of Huntington Beach
Work consists of replacement and modernization of the McFadden Sewer Lift Station (Station No. 21). The Work includes construction of a new 120 gpm submersible sewer lift station, wet well and valve vault, installation of new gravity sewer and force main, demolition and abandonment of existing facilities, installation of a backup power generator and enclosure, and site restoration. The project includes construction of curb, gutter, sidewalk, AC paving, and other appurtenant work.
Posted Date
Oct 15, 2025
Due Date
Nov 20, 2025
Release: Oct 15, 2025
City of Huntington Beach
Close: Nov 20, 2025
Work consists of replacement and modernization of the McFadden Sewer Lift Station (Station No. 21). The Work includes construction of a new 120 gpm submersible sewer lift station, wet well and valve vault, installation of new gravity sewer and force main, demolition and abandonment of existing facilities, installation of a backup power generator and enclosure, and site restoration. The project includes construction of curb, gutter, sidewalk, AC paving, and other appurtenant work.
AvailableCity of Huntington Beach
The work consists of replacement and modernization of the sewer lift station. The work includes construction of a new 120 gpm submersible sewer lift station, wet well and valve vault, installation of new gravity sewer and force main, demolition and abandonment of existing facilities, installation of a backup power generator and enclosure, and site restoration. The project includes construction of curb, gutter, sidewalk, ac paving, and other appurtenant work.
Posted Date
Oct 23, 2025
Due Date
Nov 20, 2025
Release: Oct 23, 2025
City of Huntington Beach
Close: Nov 20, 2025
The work consists of replacement and modernization of the sewer lift station. The work includes construction of a new 120 gpm submersible sewer lift station, wet well and valve vault, installation of new gravity sewer and force main, demolition and abandonment of existing facilities, installation of a backup power generator and enclosure, and site restoration. The project includes construction of curb, gutter, sidewalk, ac paving, and other appurtenant work.
AvailableCity of Montgomery
Furnish and construct lift station as shown on the plans including but not limited to: excavation & disposal, groundwater control system, wet well, wet well foundation, valve pad, piping, surface preparation and protective coating of wet well interior surfaces & lift station piping, equipment, testing, startup, materials, labor, supervision, and all appurtenances, complete in place. See attached file.
Posted Date
Nov 12, 2025
Due Date
Dec 2, 2025
Release: Nov 12, 2025
City of Montgomery
Close: Dec 2, 2025
Furnish and construct lift station as shown on the plans including but not limited to: excavation & disposal, groundwater control system, wet well, wet well foundation, valve pad, piping, surface preparation and protective coating of wet well interior surfaces & lift station piping, equipment, testing, startup, materials, labor, supervision, and all appurtenances, complete in place. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis