Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work to be accomplished under this Contract: BASE BID 1.Construct approximately 723 L.F. of 12” HDPE DR-17 sanitary sewer by trenching; 2.Construct approximately 2,395 L.F. of 10” HDPE DR-17 sanitary sewer by bursting and trenching; 3.Construct approximately 5,116 L.F. of 8” HDPE DR-17 sanitary sewer by bursting and trenching; 4.Construct twelve (12) 4’-diameter manholes, remove and replace sixteen (16) 4’-diameter, 5’-diameter, and 6’-diameter manholes. ADD ALTERNATE 1 1.Construct approximately 2,951 L.F. of 10” HDPE DR-17 sanitary sewer by bursting and trenching; 2.Construct approximately 3,982 L.F. of 8” HDPE DR-17 sanitary sewer by bursting and trenching; 3.Remove and replace nine (9) remove and replace 5’-diameter manholes. Note: The system must stay in operation throughout construction. Temporary pumping, piping, plugs, shut offs, etc. shall be considered incidental and included in the cost of other bid items.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Purpose of conducting rehabilitation of concrete sanitary sewer manholes. This specification covers work, materials and equipment required for rehabilitating unlined concrete manholes by monolithic spray-application of a corrosion protective coating to eliminate infiltration, provide corrosion protection, repair voids and enhance structural integrity. It is anticipated that 20 manholes are to be rehabilitated during this contract period on an as needed basis
Posted Date
Dec 3, 2025
Due Date
Dec 17, 2025
Release: Dec 3, 2025
Close: Dec 17, 2025
Purpose of conducting rehabilitation of concrete sanitary sewer manholes. This specification covers work, materials and equipment required for rehabilitating unlined concrete manholes by monolithic spray-application of a corrosion protective coating to eliminate infiltration, provide corrosion protection, repair voids and enhance structural integrity. It is anticipated that 20 manholes are to be rehabilitated during this contract period on an as needed basis
AvailableThe project includes the rehabilitation of existing sanitary sewer lines through pipe bursting methods, replacement of sanitary sewer service laterals, and rehabilitation of sewer manholes. Work includes, 175 SY of pavement repair (hmac type d) 2" & flowable; 120 LF of trench excavation safety protection; 665 LF of sewer main television inspection (8" - 15"); 665 LF of install 8" dr17 ips hdpe san. Sewer pipe, method pipe bursting; 1,120 LF of sewer main television inspection (8" - 15"); 1,120 LF of install 8" dr17 ips hdpe san. Sewer pipe, method pipe bursting. See attached files.
Posted Date
Dec 9, 2025
Due Date
Jan 15, 2026
Release: Dec 9, 2025
Close: Jan 15, 2026
The project includes the rehabilitation of existing sanitary sewer lines through pipe bursting methods, replacement of sanitary sewer service laterals, and rehabilitation of sewer manholes. Work includes, 175 SY of pavement repair (hmac type d) 2" & flowable; 120 LF of trench excavation safety protection; 665 LF of sewer main television inspection (8" - 15"); 665 LF of install 8" dr17 ips hdpe san. Sewer pipe, method pipe bursting; 1,120 LF of sewer main television inspection (8" - 15"); 1,120 LF of install 8" dr17 ips hdpe san. Sewer pipe, method pipe bursting. See attached files.
2022 Sanitary Sewer Improvements Contract No. 5 - Sanitary Sewer Improvements.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Close: Dec 16, 2025
2022 Sanitary Sewer Improvements Contract No. 5 - Sanitary Sewer Improvements.
Available2023 Swift Creek Sanitary Sewer Contract No. 8 - Sanitary Sewer Outfall Replacement.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
2023 Swift Creek Sanitary Sewer Contract No. 8 - Sanitary Sewer Outfall Replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis