Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Florida Fish and Wildlife Conservation Commission is seeking bids for the construction of five crushed rock parking spaces, one ADA-compliant parking space, a day use pavilion, information kiosk, asphalt driveway connection, and concrete sidewalk at Sandy Sprunt Day Use Area in Florida. Bidders are required to register in MyFloridaMarketPlace (MFMP), be registered with SunBiz, and provide contractor license evidence. Electronic plans and documents can be obtained by emailing a completed Confidentiality Exemption Form to Elbert.Orellana@myfwc.com or downloaded from the MFMP bid detail page.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Project involves demolition of the abandoned elementary school.
Posted Date
Jan 6, 2026
Due Date
Jan 26, 2026
Release: Jan 6, 2026
Close: Jan 26, 2026
The Project involves demolition of the abandoned elementary school.
AvailableProject consists of restoration and mitigation of power supply and plantwide systems. The proposed plantwide scope of work includes the installation of flood walls and flood barriers, dry flood proofing wall apertures, sealing pipe penetrations, raising and replacing existing electrical equipment, and replacing mechanical equipment with submersible type equipment which are all better suited for future flooding conditions.
Posted Date
Dec 24, 2025
Due Date
Feb 25, 2026
Release: Dec 24, 2025
Close: Feb 25, 2026
Project consists of restoration and mitigation of power supply and plantwide systems. The proposed plantwide scope of work includes the installation of flood walls and flood barriers, dry flood proofing wall apertures, sealing pipe penetrations, raising and replacing existing electrical equipment, and replacing mechanical equipment with submersible type equipment which are all better suited for future flooding conditions.
Stormwater and multi-use pathway project.
Posted Date
Jan 7, 2026
Due Date
Feb 10, 2026
Release: Jan 7, 2026
Close: Feb 10, 2026
Stormwater and multi-use pathway project.
AvailableSeeking a development partner to serve as the designated redeveloper for a portion of redevelopment area. Requesting proposals from qualified redevelopers to implement a realistic redevelopment project and to construct site improvements, building(s) and parking facilities for properties located in the gateway redevelopment project area. It is the preference of the city and para that the site be developed as a mixed-use destination development that will encompass an entertainment and/or hospitality element. This ideal location has great market potential and the city would like to develop it proactively to establish an attractive entrance to the city, to complement and integrate with the smith street commercial corridor, and to take advantage of the planned billion-dollar riverton project, just across the river from this site.
Posted Date
Sep 15, 2025
Due Date
Jan 29, 2026
Release: Sep 15, 2025
Close: Jan 29, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking a development partner to serve as the designated redeveloper for a portion of redevelopment area. Requesting proposals from qualified redevelopers to implement a realistic redevelopment project and to construct site improvements, building(s) and parking facilities for properties located in the gateway redevelopment project area. It is the preference of the city and para that the site be developed as a mixed-use destination development that will encompass an entertainment and/or hospitality element. This ideal location has great market potential and the city would like to develop it proactively to establish an attractive entrance to the city, to complement and integrate with the smith street commercial corridor, and to take advantage of the planned billion-dollar riverton project, just across the river from this site.