Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of restoration and mitigation of power supply and plantwide systems. The proposed plantwide scope of work includes the installation of flood walls and flood barriers, dry flood proofing wall apertures, sealing pipe penetrations, raising and replacing existing electrical equipment, and replacing mechanical equipment with submersible type equipment which are all better suited for future flooding conditions.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Requesting that interested firms submit proposals to participate in the selection process for the firm that will serve as the construction contractor for the Glade Pump Plant Package of the larger Glade Component of the Northern Integrated Supply Project.
Posted Date
Dec 17, 2025
Due Date
Mar 12, 2026
Release: Dec 17, 2025
Close: Mar 12, 2026
Requesting that interested firms submit proposals to participate in the selection process for the firm that will serve as the construction contractor for the Glade Pump Plant Package of the larger Glade Component of the Northern Integrated Supply Project.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement and installation of 123 UPS systems, 103 PDUs, and associated rack and wall-mount infrastructure for district-wide network equipment.
Posted Date
Dec 20, 2025
Due Date
Feb 5, 2026
Release: Dec 20, 2025
Close: Feb 5, 2026
Procurement and installation of 123 UPS systems, 103 PDUs, and associated rack and wall-mount infrastructure for district-wide network equipment.
AvailableReplace the existing pneumatic ejector with a new electric duplex grinder pump station at the power plant for the electric department. The city municipal electric power plant has a pneumatic ejector station in the basement to handle sewer waste from its four staff bathrooms and locker rooms. This system was installed during the original plant construction in the 1960s and has reached the end of its service life. This project will replace the existing pneumatic ejector with a new electric duplex grinder pump station in the power plant basement.
Posted Date
Jan 5, 2026
Due Date
Jan 21, 2026
Release: Jan 5, 2026
Close: Jan 21, 2026
Replace the existing pneumatic ejector with a new electric duplex grinder pump station at the power plant for the electric department. The city municipal electric power plant has a pneumatic ejector station in the basement to handle sewer waste from its four staff bathrooms and locker rooms. This system was installed during the original plant construction in the 1960s and has reached the end of its service life. This project will replace the existing pneumatic ejector with a new electric duplex grinder pump station in the power plant basement.
AvailableProject consists of the replacement of the existing extending aeration plant with a new 8,000 gpd package steel plant. Required yard piping, wiring and conduit to make a complete and operable system is included.
Posted Date
Dec 16, 2025
Due Date
Jan 30, 2026
Release: Dec 16, 2025
Close: Jan 30, 2026
Project consists of the replacement of the existing extending aeration plant with a new 8,000 gpd package steel plant. Required yard piping, wiring and conduit to make a complete and operable system is included.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →