Bergen County Utilities Authority
Supply, installation, testing, and commissioning of a re-manufactured jenbacher (innio) cogeneration generator (alternator and engine) to replace, in-kind, the existing cogeneration unit no. 3 an innio (formerly general electric) jenbacher jms 420 gs-n/b. L, 1419 kw, 4. 16 kv, spark-ignited, turbo-supercharged, twenty-cylinder v-block unit. The elements of the project primarily include, but are not limited to, the following: Removal of the existing generator (alternator and engine), including all rigging and electrical and mechanical disconnections; the existing alternator shall be turned over to the Authority. The engine Block to be returned to successful bidder (the successful bidder is to factor in the “credit” for receiving the existing engine block). Installation of the re-manufactured generator (alternator and engine), including all rigging and reconnection of electrical and mechanical components. An upgrade of the existing controls to the DIA.NE XT4 lite control system. Overhaul of the existing gas trains and miscellaneous related items as identified in the project specifications. Commissioning and tuning of the generator on three fuel modes (100% natural gas, 100% biogas, and a blended combination) and in black start / island mode, including training of Authority staff.
Posted Date
Jun 22, 2026
Due Date
Jul 10, 2026
Release: Jun 22, 2026
Bergen County Utilities Authority
Close: Jul 10, 2026
Supply, installation, testing, and commissioning of a re-manufactured jenbacher (innio) cogeneration generator (alternator and engine) to replace, in-kind, the existing cogeneration unit no. 3 an innio (formerly general electric) jenbacher jms 420 gs-n/b. L, 1419 kw, 4. 16 kv, spark-ignited, turbo-supercharged, twenty-cylinder v-block unit. The elements of the project primarily include, but are not limited to, the following: Removal of the existing generator (alternator and engine), including all rigging and electrical and mechanical disconnections; the existing alternator shall be turned over to the Authority. The engine Block to be returned to successful bidder (the successful bidder is to factor in the “credit” for receiving the existing engine block). Installation of the re-manufactured generator (alternator and engine), including all rigging and reconnection of electrical and mechanical components. An upgrade of the existing controls to the DIA.NE XT4 lite control system. Overhaul of the existing gas trains and miscellaneous related items as identified in the project specifications. Commissioning and tuning of the generator on three fuel modes (100% natural gas, 100% biogas, and a blended combination) and in black start / island mode, including training of Authority staff.
Bergen County Utilities Authority
Seeking to retain an engineering consulting firm to provide construction management consulting services including resident engineering, construction inspection, contract administration, and project controls services for the Fema Sandy power supply and plant wide restoration and mitigation project.
Posted Date
May 15, 2026
Due Date
Jun 11, 2026
Release: May 15, 2026
Bergen County Utilities Authority
Close: Jun 11, 2026
Seeking to retain an engineering consulting firm to provide construction management consulting services including resident engineering, construction inspection, contract administration, and project controls services for the Fema Sandy power supply and plant wide restoration and mitigation project.
Bergen County Utilities Authority
Engineering, architectural and land use services.
Posted Date
Dec 1, 2025
Due Date
Dec 15, 2025
Release: Dec 1, 2025
Bergen County Utilities Authority
Close: Dec 15, 2025
Engineering, architectural and land use services.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge