Retrieving RFP details
Release
Close
City of Sandy Hook
Project includes contractor labor for removal/replacement of existing equipment. Also included is removal/ replacement of existing equipment at the site of prison wastewater pump station.
City of Sandy Hook
Work includes removal/replacement of Existing Sewer/WWTP improvements. See outside link.
City of Evansville
Work includes replacement of the existing grating over the influent channels in the east wwtp headworks building and other related items pertinent and incidental thereto, including the furnishing of all labor, materials, supplies, equipment, work and services, ready for satisfactory and continuous operation, in accordance with the drawings and specifications. Work shall also include all supervision, equipment, traffic control, granular backfill, pavement restoration (milling included), flushing, disinfecting, testing and all appurtenances necessary.
City of Lomita
This project consists of the removal and replacement of existing playground equipment and rubberized surfaces.
Release
Oct 23, 2025
Close
Nov 20, 2025