Summary
Power equipment and distribution upgrades. Process equipment and facility upgrades. Power backup is required during gear installation concurrent with headworks process equipment installation, requiring bypass operations. Plant upgrades will be scheduled to align with Contractor procurement and confirmed upgrade equipment deliveries. Field execution of necessary plant by-passing is anticipated to be concurrent with major power gear upgrades requiring backup power. Bid Alternate No. 01 includes: Post-shutdown rehabilitation of the existing site power transformer. Remove existing transformer from duty as scheduled and required under base scope, in lieu of delivering to plant staff, arrange, ship, and have it refurbished for spare use by the WWTP. Include shipping to and return from the restoration facility. Name restoration facility and location as part of this add/alternate offering.