CityNJ
Posted
Sep 21, 2026
Oct 13, 2026
Improvements to Mechanic Street and Wilbur Drive Project
100 CY Test Pits, 400 LF Water Service, 10 UNIT Curb Valve and Box, 4 UNIT Inlet Eco Curb Piece, 7 UNIT Manhole Frame and Cover, 500 LF Concrete Vertical Curb, 50 LF Concrete Sidewalk, 175 SY Concrete Driveway Repair, 4,000 SY HMA Milling, 100 SY HMA Pavement Repair, 400 GAL Tack Coat, 485 TON HMA Surface Course, 50 TON HMA Leveling Course, 2 UNIT Speed Hump, striping, signage, site restoration, and other incidentals.
