Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Mobile County
The salt aire shoreline restoration project consists of construction of shoreline protection and hydraulic dredging and placement for marsh creation. The shoreline protection includes optional excavation of flotation access channels, and the construction of graded rock riprap breakwaters. The marsh creation includes the construction of earthen containment dikes between the breakwater gaps, hydraulic dredging of an offshore borrow area, placement of dredged fill within the marsh creation areas, and excavation of tidal creeks.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Monroe County
Provide a living shoreline system to enhance resilience and protect the transfer station and provide environmental benefits.
Posted Date
Oct 23, 2025
Due Date
Dec 4, 2025
Release: Oct 23, 2025
Monroe County
Close: Dec 4, 2025
Provide a living shoreline system to enhance resilience and protect the transfer station and provide environmental benefits.
AvailableMonroe County
Work includes restore and enhance the performance of the existing breakwater within its original footprint, while integrating nature-based solutions to protect the interior shoreline, reduce flood risk, and improve water quality and nearshore habitat conditions.
Posted Date
Oct 26, 2025
Due Date
Dec 11, 2025
Release: Oct 26, 2025
Monroe County
Close: Dec 11, 2025
Work includes restore and enhance the performance of the existing breakwater within its original footprint, while integrating nature-based solutions to protect the interior shoreline, reduce flood risk, and improve water quality and nearshore habitat conditions.
AvailableThree Rivers Park District
Project consists of shoreline stabilization including installation of rip-rap, vegetated rip-rap. Site improvements to include concrete stairs and trails, aggregate trails, stone retaining walls site grading and restoration at multiple access points along the river edge. See outside link.
Posted Date
Nov 12, 2025
Due Date
Dec 2, 2025
Release: Nov 12, 2025
Three Rivers Park District
Close: Dec 2, 2025
Project consists of shoreline stabilization including installation of rip-rap, vegetated rip-rap. Site improvements to include concrete stairs and trails, aggregate trails, stone retaining walls site grading and restoration at multiple access points along the river edge. See outside link.
AvailableCity of Tega Cay
Accepting sealed bids for shoreline stabilization. Shoreline stabilization would include the use of rip rap along approx 525ft of shoreline with approx 325 tons of rip rap. Shoreline stabilization (rip rap) shall be installed by boat.
Posted Date
Nov 10, 2025
Due Date
Jan 8, 2026
Release: Nov 10, 2025
City of Tega Cay
Close: Jan 8, 2026
Accepting sealed bids for shoreline stabilization. Shoreline stabilization would include the use of rip rap along approx 525ft of shoreline with approx 325 tons of rip rap. Shoreline stabilization (rip rap) shall be installed by boat.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis