Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide engineering design services for shoreline armor removal for the purpose of habitat enhancement or restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of professional engineering services for the design of a 2 MGD granular activated carbon (GAC) PFAS removal facility and a concurrent GAC product selection pilot study for the Lake Murray WTP.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Procurement of professional engineering services for the design of a 2 MGD granular activated carbon (GAC) PFAS removal facility and a concurrent GAC product selection pilot study for the Lake Murray WTP.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking a professional services firm for the design and permitting of 0.16 miles (or 845 LF) living shoreline between two (2) parks. The project will use nature-based solutions to mitigate the risks of flooding, as well as improve habitat and water quality, reduce erosion, and buffer storm effects
Posted Date
Jan 23, 2026
Due Date
Feb 23, 2026
Release: Jan 23, 2026
Close: Feb 23, 2026
Seeking a professional services firm for the design and permitting of 0.16 miles (or 845 LF) living shoreline between two (2) parks. The project will use nature-based solutions to mitigate the risks of flooding, as well as improve habitat and water quality, reduce erosion, and buffer storm effects
AvailableSeeking a professional services firm for the design and permitting of 0.16 miles (or 845 LF) living shoreline between two (2) parks. The project will use nature-based solutions to mitigate the risks of flooding, as well as improve habitat and water quality, reduce erosion, and buffer storm effects
Posted Date
Jan 23, 2026
Due Date
Feb 23, 2026
Release: Jan 23, 2026
Close: Feb 23, 2026
Seeking a professional services firm for the design and permitting of 0.16 miles (or 845 LF) living shoreline between two (2) parks. The project will use nature-based solutions to mitigate the risks of flooding, as well as improve habitat and water quality, reduce erosion, and buffer storm effects
AvailableWork includes comprehensive architectural and engineering design services, dsa process coordination, landscape design and landscape irrigation design; and civil, structural, mechanical, and electrical engineering services necessary to complete various projects.
Posted Date
Jan 21, 2026
Due Date
Feb 13, 2026
Release: Jan 21, 2026
Close: Feb 13, 2026
Work includes comprehensive architectural and engineering design services, dsa process coordination, landscape design and landscape irrigation design; and civil, structural, mechanical, and electrical engineering services necessary to complete various projects.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →