Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project includes shoreline restoration of 23-acre using native vegetation, stone and bio-engineered techniques.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project includes the of dredging of the accumulated sediment from 23-acre mastodon lake using hydraulic dredging methods, dewatering and hauling of dredged materials, installation of mechanical mixing and aeration devices, installation of culvert pipes, as well as other miscellaneous appurtenances.
Posted Date
Dec 19, 2025
Due Date
Jan 15, 2026
Release: Dec 19, 2025
Close: Jan 15, 2026
Project includes the of dredging of the accumulated sediment from 23-acre mastodon lake using hydraulic dredging methods, dewatering and hauling of dredged materials, installation of mechanical mixing and aeration devices, installation of culvert pipes, as well as other miscellaneous appurtenances.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The salt aire shoreline restoration project consists of construction of shoreline protection and hydraulic dredging and placement for marsh creation. The shoreline protection includes optional excavation of flotation access channels, and the construction of graded rock riprap breakwaters. The marsh creation includes the construction of earthen containment dikes between the breakwater gaps, hydraulic dredging of an offshore borrow area, placement of dredged fill within the marsh creation areas, and excavation of tidal creeks.
Posted Date
Nov 12, 2025
Due Date
Jan 7, 2026
Release: Nov 12, 2025
Close: Jan 7, 2026
The salt aire shoreline restoration project consists of construction of shoreline protection and hydraulic dredging and placement for marsh creation. The shoreline protection includes optional excavation of flotation access channels, and the construction of graded rock riprap breakwaters. The marsh creation includes the construction of earthen containment dikes between the breakwater gaps, hydraulic dredging of an offshore borrow area, placement of dredged fill within the marsh creation areas, and excavation of tidal creeks.
AvailableProvide naval support area (NSA) cutler shoreline restoration, coastal resiliency, and asset protection.
Posted Date
Dec 4, 2025
Due Date
Jan 16, 2026
Release: Dec 4, 2025
Close: Jan 16, 2026
Provide naval support area (NSA) cutler shoreline restoration, coastal resiliency, and asset protection.
AvailableProvide a living shoreline system to enhance resilience and protect the transfer station and provide environmental benefits. Mobilization and demobilization; maintenance of traffic (furnish and install); temporary staging area erosion and sediment control (furnish and install); floating turbidity barrier (furnish and install); soil tracking prevention device; 4,788 sf living shoreline creation and shoreline stabilization base material (furnish and install); 10,052 sf living shoreline plantings (furnish and install); 460 ea shoreline stabilization measures (furnish and install); construction surveys; rehabilitation of temporary staging area to original condition; 4,273 sf equivalent shoreline stabilization measures (furnish and install). See outside link.
Posted Date
Oct 23, 2025
Due Date
Jan 6, 2026
Release: Oct 23, 2025
Close: Jan 6, 2026
Provide a living shoreline system to enhance resilience and protect the transfer station and provide environmental benefits. Mobilization and demobilization; maintenance of traffic (furnish and install); temporary staging area erosion and sediment control (furnish and install); floating turbidity barrier (furnish and install); soil tracking prevention device; 4,788 sf living shoreline creation and shoreline stabilization base material (furnish and install); 10,052 sf living shoreline plantings (furnish and install); 460 ea shoreline stabilization measures (furnish and install); construction surveys; rehabilitation of temporary staging area to original condition; 4,273 sf equivalent shoreline stabilization measures (furnish and install). See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →